Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Centrifugal Chiller YKFQFTQ65CEGS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Chliller Maintenance
7.1.4 Every 3 Months
Perform chemical analysis of oil
Leak test the unit
Were any leaks found during the test?
Describe the repairs made for any leaks found
7.4.2 Leak Testing
Charge the system with refrigerant
Perform leak test with R134a compatible leak detector
Are all joints tight?
1 Yearly Chiller Maintenance
7.1.6 Annually (more often if necessary)
Inspect and service electrical components as necessary
7.8 Electrical Controls
Inspect all electrical controls for obvious malfunctions
Ensure factory settings of controls (operation and safety) are unchanged
Perform chemical analysis of system
Chiller Tube Leak Testing
Tube Leak Detection
Check for potential leak scenarios
Is refrigerant detected at the liquid head vents after shutdown?
Has system capacity and efficiency dropped sharply?
Immediate Actions for Leaking Tubes
Valve off evaporator and condenser from the water circuit
Drain evaporator and condenser immediately
Drain and purge refrigerant system with dry nitrogen
Tube Leak Testing Procedure
1 Daily Chiller Operation Check
7.1.2 Daily
Check graphic control centre (OptiView) displays.
Is the compressor in operation?
Enter the bearing oil pressure from the SYSTEM Screen.
Enter the oil level in the oil reservoir.
Is the operating oil level between the upper and lower sight glasses?
Drain or add oil if necessary.
Enter the entering condenser water pressure and temperature from the SYSTEM Screen.
Enter the leaving condenser water pressure and temperature from the SYSTEM Screen.
1 Yearly Compressor Maintenance
7.1.6 Annually (more often if necessary)
Drain and replace the oil in the compressor oil sump
7.3 Oil Charge
Verify the nominal oil charge for the compressor is 75.7 litres of York 'K' oil
Ensure only York 'K' refrigeration oil is used in the centrifugal compressor
Check that the oil is kept tightly capped until used
7.3.1 Oil Charging Procedure
Shut down the unit
Prepare the oil charging pump and connect to the oil charging valve
Access the parts list for your equipment in MaintainX.
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX