MaintainX Asset Hub logo
EnterprisePricing
York

York Centrifugal Chiller YKHQFVP95CEGS

Need answers fast?
Explore the manual using AI.

York Centrifugal Chiller YKHQFVP95CEGS
York Centrifugal Chiller YKHQFVP95CEGS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Centrifugal Chiller YKHQFVP95CEGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKHQFVP95CEGS

York Centrifugal Chiller YKHQFVP95CEGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKHQFVP95CEGS

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Chiller Operation Check

Check mark

7.1.2 Daily

Check mark

Check graphic control centre (OptiView) displays.

Check mark

Is the compressor in operation?

Check mark

Enter the bearing oil pressure from the SYSTEM Screen.

Check mark

Enter the oil level in the oil reservoir.

Check mark

Is the operating oil level between the upper and lower sight glasses?

Check mark

Drain or add oil if necessary.

Check mark

Enter the entering condenser water pressure and temperature from the SYSTEM Screen.

Check mark

Enter the leaving condenser water pressure and temperature from the SYSTEM Screen.

Run this procedureArrow right

1 Yearly Heat Exchangers Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and clean components

Check mark

7.5 Condenser and Evaporator

Check mark

Check for common water issues

Check mark

Is water treatment necessary?

Check mark

Recommendations for water treatment

Check mark

7.5.1 Chemical Water Treatment

Check mark

Has a chemical analysis of the water been conducted?

Check mark

Water treatment expert consultation notes

Run this procedureArrow right

Chiller Shutdown Maintenance

Check mark

6.8 Prolonged Shutdown

Check mark

Test all system joints for refrigerant leaks with a leak detector

Check mark

Were any refrigerant leaks found?

Check mark

Repair any detected refrigerant leaks before long-term shutdown

Check mark

Periodically check the tightness of the system during idle periods

Check mark

Drain water from cooling tower, condenser, condenser pump, chilled water system, chilled water pump, and coils if freezing temperatures are expected

Check mark

Open drains on evaporator and condenser liquid heads to ensure complete drainage

Check mark

Drain water from additional systems if applicable

Check mark

Disable the clock on the SETUP Screen to conserve battery

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

7.1.5 Every 6 Months (or more often as required)

Check mark

Change and inspect compressor oil filter element

Check mark

Check controls and safety cutouts

Check mark

7.6 Compressor

Check mark

Is the unit shutting down on High Oil Temperature or Low Oil Pressure?

Check mark

Change the oil filter element if necessary

Check mark

Examine the oil filter element for aluminum particles and describe findings

Check mark

Are aluminum particles found in the oil filter?

Check mark

If aluminum particles are found, describe the actions taken or recommendations from York Service Agent

Run this procedureArrow right

3 Monthly Chliller Maintenance

Check mark

7.1.4 Every 3 Months

Check mark

Perform chemical analysis of oil

Check mark

Leak test the unit

Check mark

Were any leaks found during the test?

Check mark

Were all detected leaks repaired immediately?

Check mark

7.4.2 Leak Testing

Check mark

Perform leak test with R134a compatible leak detector

Check mark

Are all joints tight?

Check mark

Were any leaks indicated?

Run this procedureArrow right

Parts for York Centrifugal Chiller YKHQFVP95CEGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets