MaintainX Asset Hub logo
EnterprisePricing
York

York Centrifugal Chiller YKPQPQK25CNGS

Need answers fast?
Explore the manual using AI.

York Centrifugal Chiller YKPQPQK25CNGS
York Centrifugal Chiller YKPQPQK25CNGS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Centrifugal Chiller YKPQPQK25CNGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKPQPQK25CNGS

York Centrifugal Chiller YKPQPQK25CNGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKPQPQK25CNGS

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Chiller Maintenance

Check mark

7.1.5 Every 6 Months (or more often as required)

Check mark

Change and inspect compressor oil filter element

Check mark

Inspect for internal wearing of compressor parts

Check mark

Is the unit shutting down on High Oil Temperature or Low Oil Pressure?

Check mark

Examine oil filter element for aluminum particles

Check mark

Are aluminum particles found in the oil filter?

Check mark

Describe any findings of aluminum particles and actions taken

Check mark

Change oil filter when VSOP Drive frequency reaches 55 Hz

Check mark

Inspect oil filter for aluminum particles indicating possible bearing wear

Run this procedureArrow right

1 Weekly Refrigerant Charge Check

Check mark

7.1.3 Weekly

Check mark

Check the refrigerant charge (See Refrigerant Charge Checking)

Check mark

7.4.1 Checking The Refrigerant Charge

Check mark

Record the refrigerant level after initial charging

Check mark

Is the refrigerant level visible in the sight glass?

Check mark

Ensure the system is shut down before checking and trimming the refrigerant charge

Check mark

Has the pressure and temperature equalised between the condenser and evaporator?

Check mark

Enter the time elapsed since the compressor and water pumps were stopped (in hours)

Run this procedureArrow right

1 Yearly Chiller Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and service electrical components as necessary

Check mark

Perform chemical analysis of system

Check mark

7.8 Electrical Controls

Check mark

Inspect all electrical controls for obvious malfunctions

Check mark

Ensure factory settings of controls (operation and safety) are unchanged

Run this procedureArrow right

3 Monthly Chliller Maintenance

Check mark

7.1.4 Every 3 Months

Check mark

Perform chemical analysis of oil

Check mark

Leak test the unit

Check mark

Were any leaks found?

Check mark

Repair any leaks found immediately

Check mark

7.4.2 Leak Testing

Check mark

Charge the system

Check mark

Perform leak test with R134a compatible leak detector

Check mark

Are all joints tight?

Run this procedureArrow right

Chiller Shutdown Maintenance

Check mark

6.8 Prolonged Shutdown

Check mark

Test all system joints for refrigerant leaks with a leak detector

Check mark

Were any refrigerant leaks found?

Check mark

Repair any detected refrigerant leaks before long-term shutdown

Check mark

Is the system tightness checked periodically during idle periods?

Check mark

Drain water from cooling tower, condenser, condenser pump, chilled water system, chilled water pump, and coils if freezing temperatures are encountered

Check mark

Open drains on evaporator and condenser liquid heads to ensure complete drainage

Check mark

Drain water from additional systems if applicable

Check mark

Disable the clock on the SETUP Screen to conserve battery

Run this procedureArrow right

Parts for York Centrifugal Chiller YKPQPQK25CNGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets