Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Centrifugal Chiller YKPQPQK25CNGS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Chiller Maintenance
7.1.5 Every 6 Months (or more often as required)
Change and inspect compressor oil filter element
Inspect for internal wearing of compressor parts
Is the unit shutting down on High Oil Temperature or Low Oil Pressure?
Examine oil filter element for aluminum particles
Are aluminum particles found in the oil filter?
Describe any findings of aluminum particles and actions taken
Change oil filter when VSOP Drive frequency reaches 55 Hz
Inspect oil filter for aluminum particles indicating possible bearing wear
1 Weekly Refrigerant Charge Check
7.1.3 Weekly
Check the refrigerant charge (See Refrigerant Charge Checking)
7.4.1 Checking The Refrigerant Charge
Record the refrigerant level after initial charging
Is the refrigerant level visible in the sight glass?
Ensure the system is shut down before checking and trimming the refrigerant charge
Has the pressure and temperature equalised between the condenser and evaporator?
Enter the time elapsed since the compressor and water pumps were stopped (in hours)
1 Yearly Chiller Maintenance
7.1.6 Annually (more often if necessary)
Inspect and service electrical components as necessary
Perform chemical analysis of system
7.8 Electrical Controls
Inspect all electrical controls for obvious malfunctions
Ensure factory settings of controls (operation and safety) are unchanged
3 Monthly Chliller Maintenance
7.1.4 Every 3 Months
Perform chemical analysis of oil
Leak test the unit
Were any leaks found?
Repair any leaks found immediately
7.4.2 Leak Testing
Charge the system
Perform leak test with R134a compatible leak detector
Are all joints tight?
Chiller Shutdown Maintenance
6.8 Prolonged Shutdown
Test all system joints for refrigerant leaks with a leak detector
Were any refrigerant leaks found?
Repair any detected refrigerant leaks before long-term shutdown
Is the system tightness checked periodically during idle periods?
Drain water from cooling tower, condenser, condenser pump, chilled water system, chilled water pump, and coils if freezing temperatures are encountered
Open drains on evaporator and condenser liquid heads to ensure complete drainage
Drain water from additional systems if applicable
Disable the clock on the SETUP Screen to conserve battery
Access the parts list for your equipment in MaintainX.
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
Heat Conductive Compound
013-00890-000
Oil Charging Pump
070-10654
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX