PDF MANUAL

Manual for York Centrifugal Chiller YKMQMQK15CNGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKMQMQK15CNGS

York Centrifugal Chiller YKMQMQK15CNGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKMQMQK15CNGS

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Chiller Startup Check

Check mark

5.1 Preparation

Check mark

Inspect unit for installation damage

Check mark

Check refrigerant charge and inspect for leaks

Check mark

Check oil system charge and oil level

Check mark

Verify single point of electrical isolation

Check mark

Inspect control panel for foreign materials and cleanliness

Check mark

Check correct connection of customer power cables

Check mark

Verify proper earthing of unit and tightness of internal earth connections

Check mark

Verify site voltage supply corresponds to unit requirement

Run this procedureArrow right

1 Daily Chiller Operation Check

Check mark

7.1.2 Daily

Check mark

Check graphic control centre (OptiView) displays.

Check mark

Check for any signs of dirty or fouled condenser tubes.

Check mark

Compressor Operation Checks

Check mark

Is the compressor in operation?

Check mark

Enter the bearing oil pressure on the SYSTEM Screen.

Check mark

Enter the oil level in the oil reservoir.

Check mark

Is the operating oil level between the upper and lower sight glasses?

Check mark

Drain or add oil if necessary.

Run this procedureArrow right

3 Monthly Chliller Maintenance

Check mark

7.1.4 Every 3 Months

Check mark

Perform chemical analysis of oil

Check mark

Leak test the unit

Check mark

Were any leaks found during the test?

Check mark

Repair any leaks found immediately

Check mark

7.4.2 Leak Testing

Check mark

Charge the system

Check mark

Perform leak test with R134a compatible leak detector

Check mark

Are all joints tight?

Run this procedureArrow right

1 Yearly Chiller Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and service electrical components as necessary

Check mark

Perform chemical analysis of system

Check mark

7.8 Electrical Controls

Check mark

Inspect all electrical controls for obvious malfunctions

Check mark

Ensure factory settings of controls (operation and safety) are unchanged

Run this procedureArrow right

Chiller Refrigerant Maintenance

Check mark

7.4.4 Refrigerant Charging

Check mark

Remove refrigerant charge when opening any part of the refrigerant system for repairs.

Check mark

Isolate refrigerant in the following components if equipped with optional valves

Check mark

Add only refrigerant vapour to the system until pressure is above freezing point of evaporator liquid.

Check mark

Enter the system pressure after adding refrigerant vapour.

Check mark

Ensure the system pressure is above 58.9 kPa for R134a to prevent freezing.

Check mark

Prevent moisture laden air from entering the system during charging.

Check mark

Make up a suitable charging connection from new copper tubing.

Check mark

Purge the charging connection each time a new container of refrigerant is connected.

Run this procedureArrow right

Parts for York Centrifugal Chiller YKMQMQK15CNGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets