Manual for York Centrifugal Chiller YKJPJSP95CEGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKJPJSP95CEGS

York Centrifugal Chiller YKJPJSP95CEGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKJPJSP95CEGS

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Chliller Maintenance

Check mark

7.1.4 Every 3 Months

Check mark

Perform chemical analysis of oil

Check mark

Leak test the unit

Check mark

Were any leaks found?

Check mark

Repair any leaks found immediately

Check mark

7.4.2 Leak Testing

Check mark

Charge the system

Check mark

Perform leak test with R134a compatible leak detector

Check mark

Are all joints tight?

Run this procedureArrow right

1 Yearly Compressor Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Drain and replace the oil in the compressor oil sump

Check mark

7.3 Oil Charge

Check mark

Verify the nominal oil charge for the compressor is 75.7 litres of York 'K' oil

Check mark

Ensure only York 'K' refrigeration oil is used in the centrifugal compressor

Check mark

Keep oil tightly capped until used to prevent moisture absorption

Check mark

7.3.1 Oil Charging Procedure

Check mark

Shut down the unit

Check mark

Prepare the oil charging pump and connect to the oil charging valve

Run this procedureArrow right

1 Weekly Refrigerant Charge Check

Check mark

7.1.3 Weekly

Check mark

Check the refrigerant charge (See Refrigerant Charge Checking)

Check mark

7.4.1 Checking The Refrigerant Charge

Check mark

Record the refrigerant level after initial charging

Check mark

Is the refrigerant level visible in the sight glass?

Check mark

Ensure the system is shut down before checking and trimming the refrigerant charge

Check mark

Verify that at least 4 hours have passed since the compressor and water pumps were stopped

Check mark

Have the pressure and temperature equalised between the condenser and evaporator?

Run this procedureArrow right

Chiller Refrigerant Maintenance

Check mark

7.4.4 Refrigerant Charging

Check mark

Remove refrigerant charge when opening any part of the refrigerant system for repairs.

Check mark

Isolate refrigerant in either the condenser or evaporator/compressor if equipped with optional valves.

Check mark

Add only refrigerant vapour to the system until pressure is above freezing point of evaporator liquid.

Check mark

Ensure system pressure is above 58.9 kPa for R134a to prevent freezing.

Check mark

Prevent moisture laden air from entering the system during charging.

Check mark

Make up a suitable charging connection from new copper tubing.

Check mark

Purge the charging connection each time a new container of refrigerant is connected.

Check mark

Change containers quickly to minimise refrigerant loss.

Run this procedureArrow right

1 Yearly Heat Exchangers Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and clean components

Check mark

7.5 Condenser and Evaporator

Check mark

Check for common water issues

Check mark

Is water treatment necessary?

Check mark

Recommendations for water treatment

Check mark

7.5.1 Chemical Water Treatment

Check mark

Has a chemical analysis of the water been conducted?

Check mark

Water treatment expert consultation notes

Run this procedureArrow right

Parts for York Centrifugal Chiller YKJPJSP95CEGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets