MaintainX Asset Hub logo
EnterprisePricing
Telsmith

Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

Need answers fast?
Explore the manual using AI.

Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck
Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

Create an account to install this asset package.

Maintenance Plans for Telsmith Vibrating Aggregate Screen Model 4 x 10 Single Deck

Integrate maintenance plans directly into your work orders in MaintainX.

Vibrating Aggregate Screen Oil Temperature Check

Check mark

Initial Inspection

Check mark

Check for signs of oil breakdown

Check mark

Temperature Measurement

Check mark

Measure temperature on the bearing housing face using a magnetic thermometer

Check mark

Measure temperature on the bearing housing rim using a magnetic thermometer

Check mark

Check for hot spots using a hand held digital heat scanning device

Check mark

Temperature Evaluation

Check mark

Is any bearing cover showing more than 180°F (82°C)?

Check mark

Overtemperature Investigation

Run this procedureArrow right

1 Daily Vibrating Aggregate Screen Check

Check mark

Wire Cloth Screen Inspection

Check mark

Check wire weave for breaks, tears or separation of the wire.

Check mark

Replace wire that exhibits any damage.

Check mark

Operating Screen Observation

Check mark

Are there any panels with 'dead spots' where material is puddling?

Check mark

Replace wire panels that no longer maintain tension over the complete surface area.

Check mark

Screen Tension and Buffer Check

Check mark

Is the screen tight against all buffer and crown bars?

Check mark

Replace rubber if missing, torn, or worn through to the metal on crown bars.

Run this procedureArrow right

1 Weekly Vibrating Aggregate Screen Maintenance

Check mark

Vibrator Oil Inspection

Check mark

Check vibrator oil for impurities (oil sample)

Check mark

Hardware and Fasteners Inspection

Check mark

Check nuts and bolts for tightness or missing fasteners

Check mark

Drive Sheave and Motor Inspection

Check mark

Check that vibrating unit drive sheave is free of debris and tight on shaft bushing

Check mark

Check that electric drive motor output sheave is tight on shaft

Check mark

Friction Pucks Inspection

Check mark

Inspect friction pucks. Replace if surface is worn below usable dimension

Run this procedureArrow right

Vibrating Aggregate Screen Counterweight Shim Replacement

Check mark

Preparation

Check mark

Consult Telsmith Engineering Department before proceeding with any change in counterweight balance shims.

Check mark

Shim Removal

Check mark

Remove the two hex head capscrews holding the counterweight shim stack to the face of the counterweight.

Check mark

Slide the shims out one at a time off the counterweight hub and lower to the floor.

Check mark

Shim Installation

Check mark

If additional shims are required, slide them on the counterweight hub.

Check mark

Fasten the shims in position with the two hex head capscrews ensuring proper engagement with the counterweight hub.

Check mark

Safety Check

Run this procedureArrow right

Vibrating Frame Spring Replacement

Check mark

Preparation

Check mark

Lockout/Tagout power to screen as detailed in Chapter 1.

Check mark

Remove the drive belt(s) from the electric motor(s) as detailed in Chapter 3.

Check mark

Spring Removal

Check mark

Remove the friction dampening puck from each base assembly.

Check mark

Lift the screen several inches off the screen springs and base frame using a lift hoist and spreader frame.

Check mark

Block the screen up on blocking of sufficient capacity to support the screen.

Check mark

Spring Inspection

Check mark

Check the spring free height.

Run this procedureArrow right

Parts for Telsmith Vibrating Aggregate Screen 4 x 10 Single Deck

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Telsmith

Explore Other Assets