MaintainX Logo
EnterprisePricing
Sullair

Sullair Compressor PDR32X

Need answers fast?
Explore the manual using AI.

Sullair Compressor PDR32X
Sullair Compressor PDR32X

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Sullair Compressor PDR32X

Sullair Compressor PDR32X

Create an account to install this asset package.

Maintenance Plans for Sullair Compressor Model PDR32X

Integrate maintenance plans directly into your work orders in MaintainX.

Air FIlter Replacement

Check mark

Maintenance indicator shows a red signal?

Check mark

Clean exterior of air filter housing.

Check mark

Air filter cover removed by loosening wing nuts securing the cover?

Check mark

Internal cover plate removed?

Check mark

Element removed and interior of the housing cleaned using a damp cloth?

Check mark

Do not blow dirt out with compressed air.

Check mark

Element cleaned or replaced?

Check mark

Reassembled in the reverse order of the disassembly?

Check mark

Sign off on the air filter replacement

Run this procedureArrow right

Air FIlter Element Cleaning

Check mark

The air filter element is cleanable by one of two methods. One method is by washing with a mild household detergent and water.

Check mark

The other method is cleaning with compressed air. The maximum amount of times that an element should be cleaned is six (6) times; however, the element should be used no longer than a period of one ( 1) year without changing.

Check mark

Prior to cleaning an element, check the element for damage.

Check mark

Damaged elements are to be replaced.

Check mark

When cleaning an element, never exceed the recommended maximum pressures for water (40 PSI) or compressed air (30 PSI).

Check mark

Do not strike the element against any hard surface to dislodge dust. This will damage the sealing surfaces and possibly rupture the element.

Check mark

Never "blow" dirt out of the interior of the filter housing. This may introduce dust downstream of the filter. Instead, use a clean damp cloth.

Check mark

Do not oil the element.

Check mark

Method 1: Cleaning the Element by Washing. When washing the element, never use petroleum solutions or solvents. Also, never immerse a dirty element in water or cleaning solution.

Run this procedureArrow right

50 Hourly Compressor Maintenance

Check mark

Warning: Ensure the machine is turned off and disconnected from power source before performing any maintenance tasks.

Check mark

Clean return line strainer

Check mark

Clean return line orifice

Check mark

Clean compressor unit bearing and shaft seal orifices

Check mark

Sign off on the 50 hourly compressor maintenance

Run this procedureArrow right

Coupling Alignment Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Is the coupling aligned properly?

Check mark

If coupling is not aligned properly, refer to the maintenance section of the manual

Check mark

Coupling passed the post-alignment test?

Check mark

Sign off on the coupling alignment check

Run this procedureArrow right

Primary Separator Maintenance

Check mark

Replace your separator element when the separator maintenance indicator shows a red signal. The separator element must be replaced. Do not clean the dirty element.

Check mark

When the separator maintenance shows a red signal, separator replacement is necessary. Use primary separator replacement kit number 11173. Follow the procedure explained below for separator replacement.

Check mark

1. Remove all piping connected to the sump cover to allow removal (return line, service line, etc.).

Check mark

2. Remove cover bolts and lift cover from sump.

Check mark

3. Remove separator element.

Check mark

4. Scrape old gasket material from cover and flange on sump.

Check mark

5. Install gaskets.

Check mark

6. Install element.

Check mark

7. Inspect secondary separator element and replace if necessary (see Secondary Separator Replacement).

Run this procedureArrow right

Parts for Sullair Compressor PDR32X

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Aftercooler

41807

Clamp, Muffler Strap

43713

Flange, Screved 3"

42840

Separator

41808

Trap, Moisture

42034

Aftercooler

41807

Clamp, Muffler Strap

43713

Flange, Screved 3"

42840

Separator

41808

Trap, Moisture

42034

Aftercooler

41807

Clamp, Muffler Strap

43713

Flange, Screved 3"

42840

Separator

41808

Trap, Moisture

42034

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Sullair

Explore Other Assets