Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Sullair Rotary Vacuum System VS16 30HP: Open
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Inlet Filter Maintenance
Inlet Filter Maintenance
Filter maintenance gauges indicate need for maintenance
Inlet Filter Element Replacement
Exterior of air filter housing cleaned
Inlet filter cover removed
Element removed and base and interior of cover cleaned
Element cleaned or replaced
Cover replaced
Inlet Filter Element Cleaning
Initial 50 Hours Vacuum System Maintenance
Maintenance after initial 50 hours of operation
Clean the return line strainer(s)
Clean the return line orifice(s) if so equipped
Clean the vacuum unit gear housing, bearing and shaft seal orifices
Warning: Care must be taken not to damage the shaft
Clean the fluid pump suction strainer
Sign off on the maintenance
1 Daily Vacuum System Maintenance
6.2 DAILY OPERATION
Check the fluid level in the sump
If the fluid level is low, enter the necessary amount to be added
If the addition of fluid becomes too frequent, refer to the Troubleshooting Section (6.7) under Excessive Fluid Consumption
After a routine start, check if the gauges monitor the correct readings
After the machine has warmed up, check if the Vacuum System is running properly
1 Yearly Separator Element Replacement - 50HP/30KW
SEPARATOR ELEMENTS REPLACEMENT - 50HP/30KW
Refer to Figure 6-3B. The separator elements must be changed when 'Separator Maintenance Required' message is displayed, or once a year whichever occurs first. Order separator elements, number 250034-124 (primary), and number 250034-130 (secondary).
Relieve all pressure from the separator and all compressor lines.
Disconnect all piping connected to the separator cover (return lines, service lines, etc.) to allow removal.
Loosen and remove the twelve (12) 3/4' x 3' hex head capscrews from the cover plate.
Lift the cover plate from the separator.
Remove the primary and secondary separator elements.
Scrape the old gasket material from the cover and flange on the sump being careful not to let the scraps fall into the sump.
DO NOT blow dirt out of housing with compressed air.
1 Yearly Separator Element Replacement - 30-40HP/ 22-30KW
SEPARATOR ELEMENT REPLACEMENT - 30-40HP/ 22-30KW
Refer to Figure 6-3A. The separator elements) must be changed when required by the maintenance gauge or once a year, whichever occurs first.
Follow the procedure explained below for separator element replacement.
Relieve all pressure from the sump tank.
Disconnect all piping connected to the sump cover to allow removal of return lines, discharge lines, etc.
Loosen and remove the twelve (12) hex head capscrews from the cover plate.
Lift the cover plate from the sump.
Remove the element(s).
Inspect the receiver/sump tank for rust, dirt, etc.
Access the parts list for your equipment in MaintainX.
Vacuum Gauge
250042-041
Inlet Filter
250024-659
Vacuum Switch
02250164-176
Inlet Check Valve
250028-224
Butterfly Valve
040640
Vacuum Gauge
250042-041
Inlet Filter
250024-659
Vacuum Switch
02250164-176
Inlet Check Valve
250028-224
Butterfly Valve
040640
Vacuum Gauge
250042-041
Inlet Filter
250024-659
Vacuum Switch
02250164-176
Inlet Check Valve
250028-224
Butterfly Valve
040640
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX