MaintainX Asset Hub logo
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125
KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Chemical Pump Model MCPK050-32-125

Integrate maintenance plans directly into your work orders in MaintainX.

Suction Filter Inspection

Check mark

Filter Monitoring

Check mark

Record the differential pressure across the filter

Check mark

Is the differential pressure within acceptable limits?

Check mark

Filter Cleaning

Check mark

Is filter cleaning required based on the pressure reading?

Check mark

Was the filter cleaned successfully?

Check mark

Post Inspection

Check mark

Ensure all tools and equipment are removed from the work area

Check mark

Dispose of any waste materials properly

Run this procedureArrow right

Initial Motor Mounting

Check mark

Check applicability of steps 1 and 2

Check mark

Shift the motor to connect it to the pump via the coupling

Check mark

Fasten the motor to the baseplate

Check mark

Align pump and motor

Check mark

Connect the motor to the power supply

Run this procedureArrow right

Impeller Removal

Check mark

Verify notes and steps from Section 7.4.1 to Section 7.4.4 have been observed/carried out

Check mark

Ensure the back pull-out unit is in a clean and level assembly area

Check mark

Undo impeller nut 922 (right-hand thread)

Check mark

Remove impeller 230 using an impeller removal device

Check mark

Place impeller 230 on a clean and level surface

Check mark

Remove keys 940.01 from shaft 210

Check mark

Remove and dispose of joint rings 411.31/411.32

Run this procedureArrow right

Clearance Inspection

Check mark

Back Pull-Out Unit Removal

Check mark

Remove the back pull-out unit

Check mark

Clearance Measurement

Check mark

Measure clearance G, D, E

Check mark

Is the clearance G, D, E within permissible limits?

Check mark

Measure clearance C, V

Check mark

Is the clearance C, V within permissible limits?

Check mark

Casing Wear Ring Replacement

Check mark

Fit new casing wear ring if necessary

Run this procedureArrow right

Bearings Dismantling

Check mark

Observe and carry out notes and steps from Section 7.4.1 to Section 7.4.6

Check mark

Ensure the bearing bracket is kept in a clean and level assembly area

Check mark

Unscrew the hexagon socket head cap screw in the coupling hub

Check mark

Pull the coupling half off the pump shaft with a puller

Check mark

Remove key 940.02

Check mark

Undo screws 914.02 and remove drive-end bearing cover 360.02 and joint ring 400.02

Check mark

Undo screws 914.01 and remove pump-end bearing cover 360.01 and joint ring 400.01

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-125

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets