MaintainX, an Autodesk company
EnterprisePricing
Gardner Denver

Gardner Denver Base Mounted Compressor L110

Need answers fast?
Explore the manual using AI.

Gardner Denver Base Mounted Compressor L110
Gardner Denver Base Mounted Compressor L110

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gardner Denver Base Mounted Compressor L110

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gardner Denver Base Mounted Compressor L110

Gardner Denver Base Mounted Compressor L110

Create an account to install this asset package.

Maintenance Plans for Gardner Denver Base Mounted Compressor Model L110

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly / 1 Yearly Electric Motor Lubrication

Check mark

Safety Precautions

Check mark

Stop the unit

Check mark

Disconnect, lockout and tagout the unit from the power supply

Check mark

Confirm main disconnect is open and power supply to starter is locked out and tagged out

Check mark

Lubrication Process

Check mark

Remove the relief plug and free hole of hardened grease

Check mark

Wipe lubrication fitting clean

Check mark

Add grease with a hand-operated grease gun

Check mark

Post-Lubrication Steps

Run this procedureArrow right

2000 Hourly / 6 Monthly Air Intake Filter Replacement

Check mark

Safety Precautions

Check mark

Ensure the screw compressor is out of operation

Check mark

Depressurize the unit

Check mark

Secure the unit from being switched on again

Check mark

Air Filter Replacement

Check mark

Pull snap latch outward and remove housing base

Check mark

Detach air filter cartridge while slightly turning it

Check mark

Carefully insert new air filter cartridge in the housing

Check mark

Close air filter with housing base ensuring snap latches click into position

Run this procedureArrow right

4000 Hourly / 1 Yearly Fine Oil Separator Replacement

Check mark

Safety Precautions

Check mark

Shut down the compressor and relieve the system of all pressure

Check mark

Disconnect, lockout, and tagout the power supply to the compressor package

Check mark

Ensure no air/oil under pressure remains in the system

Check mark

Oil Separator Replacement

Check mark

Switch off the compressor and ensure it is depressurized by opening the ball valve at the after-cooler

Check mark

Close the ball valve after depressurization

Check mark

Detach the plastic oil extraction pipe

Check mark

Detach the plastic control air line

Run this procedureArrow right

8 Hourly Oil Level Check

Check mark

Safety Precautions

Check mark

Shut down the compressor and relieve the system of all pressure.

Check mark

Disconnect, lockout, and tagout the power supply to the compressor package.

Check mark

Oil Level Inspection

Check mark

Shut off the compressor with the STOP button.

Check mark

Wait for 5 minutes to allow the oil to settle.

Check mark

Check the oil level using the transparent plastic tube on the pressure reservoir.

Check mark

Is the oil level between the 'maximum oil level' and 'minimum oil level' marks?

Check mark

Oil Top-Up

Run this procedureArrow right

4000 Hourly / 1 Yearly Relief Valve Check

Check mark

Safety Precautions

Check mark

Use appropriate safety equipment, including hearing and eye protection.

Check mark

Ensure all safety precautions are followed when performing the PRV check.

Check mark

Testing the Pressure Relief Valve

Check mark

Test the valve using one of the following methods

Check mark

Note any local legislation considerations during testing

Check mark

Post-Test Actions

Check mark

Did the pressure relief valve close itself and is not leaky?

Check mark

If the valve is defective, close the doors of the compressor and push the Stop Button.

Run this procedureArrow right

Parts for Gardner Denver Base Mounted Compressor L110

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Lubrication Oil

AEON 9000SP

Lubrication Oil

AEON 9000SP

Lubrication Oil

AEON 9000SP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gardner Denver

Explore Other Assets