MaintainX, an Autodesk company
EnterprisePricing
Gardner Denver

Gardner Denver Base Mounted Compressor LRS132A

Need answers fast?
Explore the manual using AI.

Gardner Denver Base Mounted Compressor LRS132A
Gardner Denver Base Mounted Compressor LRS132A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gardner Denver Base Mounted Compressor LRS132A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gardner Denver Base Mounted Compressor LRS132A

Gardner Denver Base Mounted Compressor LRS132A

Create an account to install this asset package.

Maintenance Plans for Gardner Denver Base Mounted Compressor Model LRS132A

Integrate maintenance plans directly into your work orders in MaintainX.

8000 Hourly / 2 Yearly Oil Replacement

Check mark

Safety Precautions

Check mark

Shut down the compressor and relieve the system of all pressure.

Check mark

Disconnect, lockout, and tagout the power supply to the compressor package.

Check mark

Hazard Warnings

Check mark

Ensure no oil is spilled to avoid fire and slip hazards.

Check mark

Remove oil residue and other deposits from the compressor coolers.

Check mark

Inspect for leaks and address any spilled oil immediately.

Check mark

Oil Change Procedure

Check mark

Turn off the screw compressor unit and secure it against accidental restarts.

Run this procedureArrow right

8 Hourly Oil Level Check

Check mark

Safety Precautions

Check mark

Shut down the compressor and relieve the system of all pressure

Check mark

Disconnect, lockout, and tagout the power supply to the compressor package

Check mark

Ensure no oil is spilled and check for leaks

Check mark

Verify that oils with different specifications are not mixed

Check mark

Oil Level Check Procedure

Check mark

Shut off the compressor with the STOP button

Check mark

Wait at least 5 minutes for the oil to settle

Check mark

Check the oil level using the transparent plastic tube on the pressure reservoir

Run this procedureArrow right

2000 Hourly / 6 Monthly Air Intake Filter Replacement

Check mark

Safety Precautions

Check mark

Ensure the screw compressor is out of operation

Check mark

Depressurize the unit

Check mark

Secure the unit from being switched on again

Check mark

Air Filter Replacement

Check mark

Pull snap latch outward and remove housing base

Check mark

Detach air filter cartridge while slightly turning it

Check mark

Carefully insert new air filter cartridge in the housing

Check mark

Close air filter with housing base ensuring snap latches click into position

Run this procedureArrow right

4000 Hourly / 1 Yearly Relief Valve Check

Check mark

Safety Precautions

Check mark

Use appropriate safety equipment

Check mark

Wear hearing protection

Check mark

Wear eye protection

Check mark

Follow safety precautions when performing PRV check

Check mark

Testing the Pressure Relief Valve

Check mark

Test the valve on a separate compressed-air system

Check mark

Raise the system operating pressure to its normal level

Check mark

Operate the pull ring

Run this procedureArrow right

4000 Hourly / 1 Yearly Fine Oil Separator Replacement

Check mark

Safety Precautions

Check mark

Shut down the compressor and relieve the system of all pressure.

Check mark

Disconnect, lockout, and tagout the power supply to the compressor package.

Check mark

Oil Separator Replacement

Check mark

Switch off the compressor and ensure it is depressurized by opening the ball valve at the after-cooler.

Check mark

Close the ball valve after the system has been vented.

Check mark

Detach the plastic oil extraction pipe.

Check mark

Detach the plastic control air line.

Check mark

Fully remove oil extraction with pressed in extraction tube.

Run this procedureArrow right

Parts for Gardner Denver Base Mounted Compressor LRS132A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Lubrication Oil

AEON 9000SP

Lubrication Oil

AEON 9000SP

Lubrication Oil

AEON 9000SP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gardner Denver

Explore Other Assets