

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

FG Wilson Generator Set P50-3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
500 Hourly Battery Electrolyte Check
Electrolyte Level Check
Measure the electrolyte level above the plates/grids
Is the electrolyte level covering the plates/grids?
Add distilled water if the electrolyte level is below the plates/grids
Fluid Level Safety Check
Is the fluid level just touching the bottom of the filler tubes?
Battery Condition Check
Check for fluid leaks or cracked case
Racor Pre-Filter Maintenance
Preparation
Ensure fuel supply is from the correct source
With Fuel Supply from the Base Tank
Remove T-handle and lid from the top of the unit
Screw T-handle into centre tube finger tight
Fill the assembly with clean fuel to just above the top of the element
Lubricate the lid gasket and T-handle O-ring with clean fuel
Replace the lid, seat the gasket correctly, and tighten the T-handle
Operate the priming switch for 2 minutes
Fuel System Maintenance
Preparation
Ensure the generator set is stopped and there are no active or present shutdown conditions.
Verify fuel system components are in place
Priming Procedure with Base Tank
Operate the priming switch for the standard pre-set 2 minute priming cycle (Main Menu > Control > Engine Fuel Priming on PowerWizard panel).
Start the engine.
Did the engine start within 3 crank cycles?
Repeat the prime procedure if the engine did not start within 3 crank cycles.
Priming Procedure with Remote Tank
DEF Tank Storage Maintenance
Pre-storage Engine and Exhaust Preparation
Allow 2 minutes after engine stop before using battery disconnect switch
Cap the exhaust outlet of the aftertreatment
DEF Tank and Line Preparation
Ensure normal engine shutdown
Fill the tank with DEF meeting ISO 22241-1 requirements
Reconnect all DEF lines and electrical connections
Ensure DEF filler cap is correctly installed
DEF Storage Duration Limits
Alternator Inspection
Alternator Winding Inspection
Inspect the condition of the alternator winding
Clean the alternator winding
Cable Connections Inspection
Inspect the cable connections between the alternator and the circuit breaker
Consultation
Consult your local Dealer for further guidance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













