

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Heavy-Duty Submersible Mixer SR4640.390
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Propeller Change
Safety Precautions
Wear protective clothing
Tools Required
Ensure the following tools are available
Remove the Propeller
Twist off the propeller plug and the O-ring
Loosen the hub screw using an M12 hexagon bit adapter (part no 84 14 79), n=10
Remove the propeller
Remove the shaft key by handling it by its ends
Stator Housing Inspection
Safety Warning
Disconnect and lock out power
Remove the inspection screw (marked INSP)
Remove the screw inside to access the stator housing
Inspect the stator housing for any visible damage or wear
Check for any signs of corrosion or rust
Ensure all parts are securely in place
Reattach the inspection screw (marked INSP)
Restore power after inspection
24000 Hourly/6 Yearly Mixer Overhaul
Safety Precautions
Disconnect and lock out power before servicing
Inspection and Replacement Tasks
Replace key components
Is the media (liquid) temperature below 40°C (104°F)?
Post Inspection
Ensure all replaced components are properly installed
Was the area cleaned after the overhaul?
Initial 1 Year Mixer Inspection
Safety Precautions
Disconnect and lock out power before servicing
Ensure only certified electricians and Xylem-authorized mechanics perform maintenance on EN/ATEX or FM-approved mixers
Pre-Inspection Requirements
Verify the following requirements are met
Inspection and Maintenance
Conduct a check-up by an authorized Xylem service representative
Document findings and determine intervals for periodical inspection and major overhaul
Mixer Check
FLS
Check the stator housing for any leakage, and drain if necessary.
Check mechanical seals and O-rings and replace any damaged seals with new ones.
CLS (not for Ex-approved mixers)
Check the oil housing for any leakage.
Check mechanical seals and O-rings and replace any damaged seals with new ones.
Thermal contact
Check the coolant level (mixer with cooling jacket).
Check the connections and the electrical motor.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













