PDF MANUAL

Manual for Xylem Heavy-Duty Submersible Mixer SR4630.492

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Heavy-Duty Submersible Mixer SR4630.492

Xylem Heavy-Duty Submersible Mixer SR4630.492

Create an account to install this asset package.

Maintenance Plans for Xylem Heavy-Duty Submersible Mixer Model SR4630.492

Integrate maintenance plans directly into your work orders in MaintainX.

Mixer Inspection

Check mark

Cable Inspection

Check mark

Check if the outer jacket of the cable is damaged and replace if necessary.

Check mark

Ensure cables do not have any sharp bends and are not pinched.

Check mark

Check that the connections to power are properly tightened.

Check mark

Ensure electrical cabinets are clean and dry.

Check mark

Insulation Check

Check mark

Measure resistance between earth (ground) and phase lead using a megger (max 1000 V).

Check mark

Is the resistance between earth and phase lead more than 5 megohms?

Check mark

Conduct a phase-to-phase resistance check.

Run this procedureArrow right

24000 Hourly/6 Yearly Mixer Overhaul

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Inspection and Replacement Tasks

Check mark

Replace key components

Check mark

Are all components replaced successfully?

Check mark

Inspection Interval Verification

Check mark

Enter the total operating hours of the mixer

Check mark

Is the operating interval within 24,000 hours or 6 years?

Check mark

Post-Inspection

Run this procedureArrow right

12000 Hourly/3 Yearly Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Is the mixer EN/ATEX or FM-approved?

Check mark

If EN/ATEX or FM-approved, ensure only certified electricians and Xylem-authorized mechanics perform maintenance

Check mark

Pre-Inspection Requirements

Check mark

Check that the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Perform general inspection of the mixer

Check mark

Control and replace wear parts as necessary

Run this procedureArrow right

Stator Housing Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Stator Housing Inspection

Check mark

Remove the inspection screw (marked INSP)

Check mark

Remove the screw inside to access the stator housing

Run this procedureArrow right

Initial 1 Year Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Ensure only certified electricians and Xylem-authorized mechanics perform maintenance on EN/ATEX or FM-approved mixers

Check mark

Pre-Inspection Requirements

Check mark

Verify the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Conduct a check-up by an authorized Xylem service representative

Check mark

Document findings and determine intervals for periodical inspection and major overhaul

Check mark

Post-Inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets