MaintainX Asset Hub logo
EnterprisePricing
Triangle Tube

Triangle Tube Gas Condensing Boiler Prestige Solo 299

Need answers fast?
Explore the manual using AI.

Triangle Tube Gas Condensing Boiler Prestige Solo 299
Triangle Tube Gas Condensing Boiler Prestige Solo 299

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Triangle Tube Gas Condensing Boiler Prestige Solo 299

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Triangle Tube Gas Condensing Boiler Prestige Solo 299

Triangle Tube Gas Condensing Boiler Prestige Solo 299

Create an account to install this asset package.

Maintenance Plans for Triangle Tube Gas Condensing Boiler Model Prestige Solo 299

Integrate maintenance plans directly into your work orders in MaintainX.

Flame Signal Check

Check mark

Read the flame signal from the Boiler Information screen

Check mark

Is the flame signal at least 2-3 μΑ at low fire?

Check mark

If flame signal is low, check the ignitor condition

Check mark

If flame signal is low, check ground wire for continuity

Check mark

Replace ignitor if conditions are satisfactory

Run this procedureArrow right

1 Monthly Gas Condensing Boiler Maintenance

Check mark

Vent and Air Inlet Piping Inspection

Check mark

Check vent piping for obstructions or damage

Check mark

Check combustion air inlet piping for obstructions or damage

Check mark

Pressure Relief Valve Inspection

Check mark

Check the pressure relief valve for proper operation

Check mark

Condensate Drain System Inspection

Check mark

Check the condensate drain system for blockages or leaks

Run this procedureArrow right

Expansion Tank Check

Check mark

Closed-Type Tank Inspection

Check mark

Ensure tank is partially filled with water leaving an air gap as a cushion

Check mark

Ensure the tank is fitted with a device that reduces gravity circulation of air-saturated tank water back into the system

Check mark

Ensure no automatic air vents are used in the system

Check mark

Diaphragm Tank Inspection

Check mark

Ensure the system contains a minimum of one automatic air vent

Check mark

Recommended location of the air vent should be atop an air eliminator

Check mark

Remove the tank from the system and check the charge pressure

Check mark

Enter the charge pressure of the tank in psig

Run this procedureArrow right

Existing Boiler Removal

Check mark

Preparation

Check mark

Seal any unused openings in the common venting system.

Check mark

Visually inspect the venting system for proper size and horizontal pitch.

Check mark

Check for blockage, restriction, leakage, corrosion, and other deficiencies in the venting system.

Check mark

Building Setup

Check mark

Close all exterior building doors and windows.

Check mark

Close all doors between the appliance space and other spaces in the building.

Check mark

Turn on clothes dryers and any appliance not connected to the common venting system.

Check mark

Turn on any exhaust fans, such as range hoods and bathroom exhausts, to maximum speed.

Run this procedureArrow right

Burner Flame Check

Check mark

Flame Inspection

Check mark

Inspect the flame pattern through the observation port of the heat exchanger.

Check mark

Is the flame pattern fully blue and covering the entire burner surface during high fire?

Check mark

Shutdown and Disassembly

Check mark

Shut the unit down and allow it to cool thoroughly before disassembly.

Check mark

Close the external manual gas valve on the gas supply line.

Check mark

Disconnect the gas piping and gas valve wire harness connector.

Check mark

Disconnect the wiring harness connectors from the blower.

Check mark

Remove the blower clamp and blower from the unit.

Run this procedureArrow right

Parts for Triangle Tube Gas Condensing Boiler Prestige Solo 299

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Front Jacket Panel (With Insulation)

PAJKT15

Left Side Jacket Panel (With Insulation)

PAJKT16

Right Side Jacket Panel (With Insulation)

PAJKT22

Top Panel - Front

PAJKT17

Top Panel - Rear

PAJKT18

Front Jacket Panel (With Insulation)

PAJKT15

Left Side Jacket Panel (With Insulation)

PAJKT16

Right Side Jacket Panel (With Insulation)

PAJKT22

Top Panel - Front

PAJKT17

Top Panel - Rear

PAJKT18

Front Jacket Panel (With Insulation)

PAJKT15

Left Side Jacket Panel (With Insulation)

PAJKT16

Right Side Jacket Panel (With Insulation)

PAJKT22

Top Panel - Front

PAJKT17

Top Panel - Rear

PAJKT18

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Triangle Tube

Explore Other Assets