

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Davis Packaging Dual Roll Console TD - 362
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
General Cutting Rod Cleaning
General Cutting Rod Cleaning
Turn on unit and allow to heat until film cuts easily.
Pull and tear off wrapping film
Wad film into small baseball sized ball.
Gently rub film ball back and forth across Cutting Rod to remove any film residue.
Turn off or unplug unit and let cool for approximately 4 minutes.
Blow or brush film debris from unit after rod and seal plate have fully cooled.
Deep Cleaning Cutting Rod of Burnt Film
TURN OFF, UNPLUG THE UNIT, AND LET THE MACHINE COOL DOWN BEFORE CLEANING.
Thermostat Replacement
Preparation
Unplug the unit and let it cool down before proceeding
Use caution to not overtighten screws or strip screw threads when removing/reinstalling screws
Accessing the Thermostat
Slide the heat tray drawer out after unplugging and letting the unit cool
Remove the underside heat drawer cover by removing 10 small Phillips screws around the bottom cover
Take a picture of the wiring as a reference for reinstalling
Removing the Old Thermostat
Follow the metal thermostat coil wire to the center of the heat plate and remove the thermostat bulb by removing the 3 Phillips screw clips
Circuit Board Replacement
Ensure power is unplugged before beginning
Unscrew 4 screws on front of unit to release power box
Unscrew power box cover and document wire positions
Unscrew power box cover
Take picture or note position of colored wires
Remove circuit board
Squeeze plastic pins and slowly rock circuit board out of box
Pull wires off circuit board
Reconnect wires to new circuit board
Sliding Tray Heat Element Replacement
Preparation
Unplug the unit and let it cool down before proceeding
Use caution to not overtighten screws or strip screw threads when removing/reinstalling screws
Accessing Heat Elements
Slide the heat tray drawer out after cooling
Remove the underside heat drawer cover by removing small Phillips screws around the bottom cover
Take a picture of the wiring as a reference for reinstalling
Replacing Heat Elements
Remove screws from first retainer plate and remove element
1 Daily Non-Stickcover / Sealplate Cleaning
Preparation
Turn off the unit
Unplug the unit
Let the machine cool down before cleaning
Non-Stick Cover Inspection and Cleaning
Inspect the Non-stick cover for the following issues
Is the Non-stick cover in good condition?
Clean the Non-stick cover if it is not overly soiled or damaged
Seal Plate Cleaning
Access the parts list for your equipment in MaintainX.
Circuit Control Board
CB1818-001
Fuse Holder
FH1821-013
Hot Rod Cut-Off; 43 1/4 Inches Long (Td-362)
CR43-014
Hot Rod Cut-Off; 41 Inches Long (104-36)
CR41-020
Pilot Light Assembly
PL1836-004
Circuit Control Board
CB1818-001
Fuse Holder
FH1821-013
Hot Rod Cut-Off; 43 1/4 Inches Long (Td-362)
CR43-014
Hot Rod Cut-Off; 41 Inches Long (104-36)
CR41-020
Pilot Light Assembly
PL1836-004
Circuit Control Board
CB1818-001
Fuse Holder
FH1821-013
Hot Rod Cut-Off; 43 1/4 Inches Long (Td-362)
CR43-014
Hot Rod Cut-Off; 41 Inches Long (104-36)
CR41-020
Pilot Light Assembly
PL1836-004
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













