MaintainX Asset Hub logo
EnterprisePricing
Triangle Tube

Triangle Tube Gas Condensing Boiler Prestige Solo 250

Need answers fast?
Explore the manual using AI.

Triangle Tube Gas Condensing Boiler Prestige Solo 250
Triangle Tube Gas Condensing Boiler Prestige Solo 250

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Triangle Tube Gas Condensing Boiler Prestige Solo 250

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Triangle Tube Gas Condensing Boiler Prestige Solo 250

Triangle Tube Gas Condensing Boiler Prestige Solo 250

Create an account to install this asset package.

Maintenance Plans for Triangle Tube Gas Condensing Boiler Model Prestige Solo 250

Integrate maintenance plans directly into your work orders in MaintainX.

Existing Boiler Removal

Check mark

Preparation

Check mark

Seal any unused openings in the common venting system.

Check mark

Visually inspect the venting system for proper size and horizontal pitch.

Check mark

Check for blockage, restriction, leakage, corrosion, and other deficiencies in the venting system.

Check mark

Building Setup

Check mark

Ensure the following conditions are met

Check mark

Appliance Operation

Check mark

Place in operation the appliance being inspected.

Check mark

Follow the lighting instructions for the appliance.

Run this procedureArrow right

Condensate Drain Assembly Cleaning

Check mark

Disassembly and Cleaning

Check mark

Loosen the retaining nut from the condensate drain assembly and disconnect the assembly from the boiler.

Check mark

Empty any water from the trap and flush with fresh water as necessary to clean.

Check mark

Remove plastic ball and clean with fresh water.

Check mark

Check the drain piping from the condensate drain assembly to the drain. Flush to clean as necessary.

Check mark

Reassembly

Check mark

Install the plastic ball into the condensate drain assembly.

Check mark

Reassemble onto the boiler by tightening the retaining nut with rubber seal onto the boiler. Hand tight only.

Check mark

Final Steps

Run this procedureArrow right

Heat Exchanger Cleaning

Check mark

Boiler Shutdown

Check mark

Follow the instructions on Page 58 'To Turn Off Gas to Appliance'

Check mark

Is the boiler subject to freezing conditions?

Check mark

Is antifreeze used in the system?

Check mark

Allow the boiler to cool down to room temperature before servicing

Check mark

Close the external manual gas valve on the gas supply line

Check mark

Disconnect the gas piping and gas valve wire harness connector

Check mark

Disassembly

Check mark

Disconnect the wiring harness connectors from the blower

Run this procedureArrow right

Vent / Combustion Air Piping Inspection

Check mark

Visual Inspection

Check mark

Inspect the venting system for blockages

Check mark

Check for deterioration of gaskets

Check mark

Inspect for any leakage in the venting system

Check mark

Repair any deficiencies found during inspection

Check mark

Verification of Connections and Support

Check mark

Verify that the combustion air inlet is connected and sealed

Check mark

Verify that the vent piping is connected and sealed

Check mark

Ensure that the combustion air inlet and vent piping are properly supported

Run this procedureArrow right

Flue Gas Temperature Check

Check mark

Place the boiler into high fire

Check mark

Navigate to the Boiler Information Menu

Check mark

Enter the flue gas temperature

Check mark

Enter the supply water temperature

Check mark

Is the flue gas temperature more than 54°F [30°C] above the supply water temperature?

Check mark

Shut the boiler down and follow the heat exchanger cleaning procedure

Run this procedureArrow right

Parts for Triangle Tube Gas Condensing Boiler Prestige Solo 250

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Front Jacket Panel (With Insulation)

PAJKT01

Left Side Jacket Panel (With Insulation)

PAJKT03

Right Side Jacket Panel (With Insulation)

PAJKT21

Top Panel

PAJKT12

Wall Mounting Bracket With Hardware

PSRKIT21

Front Jacket Panel (With Insulation)

PAJKT01

Left Side Jacket Panel (With Insulation)

PAJKT03

Right Side Jacket Panel (With Insulation)

PAJKT21

Top Panel

PAJKT12

Wall Mounting Bracket With Hardware

PSRKIT21

Front Jacket Panel (With Insulation)

PAJKT01

Left Side Jacket Panel (With Insulation)

PAJKT03

Right Side Jacket Panel (With Insulation)

PAJKT21

Top Panel

PAJKT12

Wall Mounting Bracket With Hardware

PSRKIT21

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Triangle Tube

Explore Other Assets