Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHG - 480-565 - 489 - 050L / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Purge Unit Inspection
Pre-Inspection Preparation
Shut down the chiller
Purge Unit Inspection
Review the purge Installation, Operation, and Maintenance manual
List maintenance and/or inspection items identified from the manual
Review purge pump-out data
Describe any issues found in the purge pump-out data
Review overall operation of purge
Service the purge unit as necessary and describe actions taken
1 Daily Chiller Maintenance
Pressure Checks
Enter the evaporator pressure reading
Enter the condenser pressure reading
Enter the oil tank pressure reading
Enter the differential oil pressure reading
Enter the discharge oil pressure reading
Are all pressure readings within the normal range as per general maintenance guidelines?
Oil Level Check
Is the oil level visible in the lower sight glass when the unit is operating?
Initial 1000 Hours/6 Months Chiller Oil Replacement
Preparation
Verify proper refrigerant and compressor oil for your chiller
Ensure no mixing of refrigerants or oils to prevent equipment damage
Oil and Filter Change
Record accumulated operation hours
Has it been 6 months or 1000 hours since last oil change?
Change the compressor oil and filter if 6 months or 1000 hours have passed
Use only Trane compressor oil for the oil change
Select the appropriate oil for your chiller
1 Yearly Compressor/Motor Inspection
Compressor/Motor Inspection
Shut down the chiller
Perform the following checks on the motor
Check inlet guide vanes (IGV) for abnormalities
1 Yearly Control Circuits Inspection
Control Parameters Verification
Verify control parameters
Sensor Testing and Installation
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Temperature and Pressure Checks
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Inlet Guide Vane Actuator
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX