MaintainX Logo
EnterprisePricing
Otto Boge

Otto Boge Scroll Compressor EO 6TR

Need answers fast?
Explore the manual using AI.

Otto Boge Scroll Compressor EO 6TR
Otto Boge Scroll Compressor EO 6TR

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Otto Boge Scroll Compressor EO 6TR

Otto Boge Scroll Compressor EO 6TR

Create an account to install this asset package.

Maintenance Plans for Otto Boge Scroll Compressor Model EO 6TR

Integrate maintenance plans directly into your work orders in MaintainX.

5000 Hourly/2 Yearly Scroll Compressor Maintenance

Check mark

10 bar compressor: After 5,000 operating hours but after two years at the latest.

Check mark

8 bar compressor: After 10,000 operating hours but after four years at the latest.

Check mark

Have the following maintenance work on the scroll compressors carried out exclusively by BOGE Service personnel.

Check mark

The following work must be carried out:

Check mark

– Replace "Tip Seal" sealant on scroll compressor

Check mark

– Service / lubricate scroll compressor bearing

Check mark

– Clean cooling fins on scroll compressor.

Run this procedureArrow right

1500 Hourly/6 Monthly Cooler Cleaning

Check mark

Warning: Risk of injury due to sharp edges, hot surfaces and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.

Check mark

Switch off the compressor using the OFF button.

Check mark

Open the mains disconnecting device and secure it to prevent it being switched on again.

Check mark

Allow all hot compressor components to cool to 50°C.

Check mark

Remove all the safety claddings necessary for maintenance work.

Check mark

Open the respective housing panel. Secondary cooler: remove the housing panel above the operating elements / control.

Check mark

ATTENTION: Danger of property damage! Do not use sharp objects to clean the cooler. They may damage the cooler.

Check mark

Clean off the accumulated soiling with a fibre brush.

Check mark

Primary cooler: suck out any dirt from the system in the same direction as the normal flow of cooling air. Do not under any circumstances blow dirt into the system using compressed air.

Run this procedureArrow right

5000 Hourly/2 Yearly Cooling Air Fan Maintenance

Check mark

WARNING: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.

Check mark

Switch off the compressor using the OFF button.

Check mark

Open the mains disconnecting device and secure it to prevent it being switched on again.

Check mark

Allow all hot compressor components to cool to 50°C.

Check mark

Depressurise the system.

Check mark

Remove the right side panel of the housing and the isolating protective equipment.

Check mark

Remove the V-belts.

Check mark

Loosen the screws on the scroll compressor fan covers and remove the covers.

Check mark

Check the fans and clean if necessary.

Run this procedureArrow right

10000 Hourly/4 Yearly Scroll Compressor Maintenance

Check mark

10 bar compressor: After 5,000 operating hours but after two years at the latest.

Check mark

8 bar compressor: After 10,000 operating hours but after four years at the latest.

Check mark

Have the following maintenance work on the scroll compressors carried out exclusively by BOGE Service personnel.

Check mark

The following work must be carried out:

Check mark

– Replace "Tip Seal" sealant on scroll compressor

Check mark

– Service / lubricate scroll compressor bearing

Check mark

– Clean cooling fins on scroll compressor.

Run this procedureArrow right

10000 Hourly/4 Yearly V-Belt Maintenance

Check mark

WARNING: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.

Check mark

Switch off the compressor using the OFF button.

Check mark

Open the mains disconnecting device and secure it to prevent it being switched on again.

Check mark

Allow all hot compressor components to cool to 50°C.

Check mark

Depressurise the system.

Check mark

Remove the service side cladding.

Check mark

Remove the belt protection.

Check mark

Loosen all four motor fastening screws (2).

Check mark

Turn the belt tensioning screw (1) anti-clockwise.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Otto Boge

Explore Other Assets