MaintainX Logo
EnterprisePricing
Otto Boge

Otto Boge Scroll Compressor EO 11D

Need answers fast?
Explore the manual using AI.

Otto Boge Scroll Compressor EO 11D
Otto Boge Scroll Compressor EO 11D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Otto Boge Scroll Compressor EO 11D

Otto Boge Scroll Compressor EO 11D

Create an account to install this asset package.

Maintenance Plans for Otto Boge Scroll Compressor Model EO 11D

Integrate maintenance plans directly into your work orders in MaintainX.

500 Hourly/1 Monthly Supply Air Filter Cabinet Maintenance

Check mark

Check the function of the supply air filter mats in the switch cabinet.

Check mark

Once per month, however at least every 500 operating hours.

Check mark

Reduce interval if air is heavily polluted.

Check mark

Replace the supply air filter mats:

Check mark

When dirt becomes encrusted on the mats, or at least once a year.

Check mark

Note: Always keep a sufficient stock filter mats as replacements.

Check mark

Replacing the supply air filter mat on the switch cabinet:

Check mark

Switch off the compressor using the OFF button.

Check mark

DANGER: Danger of death due to electric current! Coming into contact with live parts, defective insulation or components can be fatal. Open the mains disconnecting device and secure against accidental switching on again using a padlock.

Run this procedureArrow right

10000 Hourly/4 Yearly V-Belt Maintenance

Check mark

Warning: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.

Check mark

Switch off the compressor using the OFF button.

Check mark

Open the mains disconnecting device and secure it to prevent it being switched on again.

Check mark

Allow all hot compressor components to cool to 50°C.

Check mark

Depressurise the system.

Check mark

Remove the service side cladding.

Check mark

Remove the belt protection.

Check mark

Loosen all four motor fastening screws (2).

Check mark

Turn the belt tensioning screw (1) anti-clockwise.

Run this procedureArrow right

3000 Hourly/1 Yearly Compressor Safety Valve Check

Check mark

WARNING

Check mark

Risk of injury from flying parts caused by overpressure, e.g., burst components bursting or detonating!

Check mark

Risk of injury due to sudden discharge of hot compressed air!

Check mark

It is forbidden to operate the compressor without the installed safety devices.

Check mark

A safety valve prevents inadmissible overpressure.

Check mark

The specified final compression pressure must not be exceeded.

Check mark

Observe the statutory regulations applicable in the installation location for operating safety devices against overpressure.

Check mark

Have the function of the safety valve checked exclusively by BOGE Service personnel.

Check mark

Interval: After approx. 3000 operating hours but at least once a year.

Run this procedureArrow right

10000 Hourly/4 Yearly Cooling Air Fan Maintenance

Check mark

WARNING: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.

Check mark

Switch off the compressor using the OFF button.

Check mark

Open the mains disconnecting device and secure it to prevent it being switched on again.

Check mark

Allow all hot compressor components to cool to 50°C.

Check mark

Depressurise the system.

Check mark

Remove the right side panel of the housing and the isolating protective equipment.

Check mark

Remove the V-belts.

Check mark

Loosen the screws on the scroll compressor fan covers and remove the covers.

Check mark

Check the fans and clean if necessary.

Run this procedureArrow right

20000 Hourly/8 Yearly Scroll Compressor Maintenance

Check mark

Warning: Scroll compressor replacement should be done exclusively by BOGE Service personnel.

Check mark

Enter the operating hours of the compressor

Check mark

Select the type of compressor

Check mark

Was the compressor replaced?

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Otto Boge

Explore Other Assets