MaintainX Asset Hub logo
EnterprisePricing
Officine E. Biglia & C.

Officine E. Biglia & C. CNC Lathe B 545 YS

Need answers fast?
Explore the manual using AI.

Officine E. Biglia & C. CNC Lathe B 545 YS
Officine E. Biglia & C. CNC Lathe B 545 YS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Officine E. Biglia & C. CNC Lathe B 545 YS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Officine E. Biglia & C. CNC Lathe B 545 YS

Officine E. Biglia & C. CNC Lathe B 545 YS

Create an account to install this asset package.

Maintenance Plans for Officine E. Biglia & C. CNC Lathe Model B 545 YS

Integrate maintenance plans directly into your work orders in MaintainX.

CNC Lathe Oil Drainage Lubrication

Check mark

Preparation

Check mark

Remove the drainage pipes A from the inside of the oil collecting container B and place them on the coolant tank

Check mark

Ensure the coolant tank is positioned to catch any oil spillage

Check mark

Oil Disposal

Check mark

Empty the container B following the general rules for the correct oil disposal

Check mark

Is the oil disposal completed according to the guidelines?

Check mark

Daily Maintenance

Check mark

Check the level control of the oil container

Check mark

Perform container drainage

Run this procedureArrow right

1 Daily CNC Lathe Air Treatment Unit Check

Check mark

Pre-Inspection

Check mark

Shut off air by the cutoff valve B

Check mark

Condensation Check

Check mark

Check condensation level in glass D

Check mark

Is condensation level acceptable?

Check mark

Drain condensation through valve E if necessary

Check mark

Lubrication Oil Check

Check mark

Check lubrication oil level in glass F

Check mark

Is lubrication oil level above 1/4?

Run this procedureArrow right

CNC Lathe Tool Replacement

Check mark

Safety Precautions

Check mark

Wear thick, cut-proof and high-resistance gloves

Check mark

Do not use a hammer to lock or unlock the frontal lock ring

Check mark

Live-Spindle Removal

Check mark

Remove the live-spindle from the machine

Check mark

Block the live-spindle on the body square part

Check mark

Frontal Lock Ring Unlocking

Check mark

Use the two spanners Q and R to unlock the frontal lock ring

Check mark

Tool Replacement

Run this procedureArrow right

1 Daily CNC Lathe Cleaning

Check mark

Chuck Maintenance

Check mark

Is greasing the self-centering chuck required?

Check mark

Grease the self-centering chuck if required

Check mark

Ensure no compressed air is used on the chuck and spindle front flange

Check mark

Collet Maintenance

Check mark

Disassemble the collet

Check mark

Clean the pusher

Check mark

Oil the collet

Check mark

Reassemble the collet

Run this procedureArrow right

1 Daily CNC Lathe Chuck Jaws Lubrication

Check mark

Daily Inspection

Check mark

Check the machine for any abnormal situations

Check mark

Inform supervisor if any abnormal situation is found

Check mark

Lubrication Process

Check mark

Inject grease in the three lubricators A on the chuck body

Check mark

Record the number of hours since last greasing

Check mark

Is more frequent greasing needed due to chips with problems?

Check mark

Grease Type Verification

Check mark

Verify the type of grease used against the User’s guide supplied by manufacturer

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Officine E. Biglia & C.

Explore Other Assets