MaintainX Asset Hub logo
EnterprisePricing
The New York Blower Company

The New York Blower Company Blower PLR 18

Need answers fast?
Explore the manual using AI.

The New York Blower Company Blower PLR 18
The New York Blower Company Blower PLR 18

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for The New York Blower Company Blower PLR 18

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

The New York Blower Company Blower PLR 18

The New York Blower Company Blower PLR 18

Create an account to install this asset package.

Maintenance Plans for The New York Blower Company Blower Model PLR 18

Integrate maintenance plans directly into your work orders in MaintainX.

Safety Guards Inspection

Check mark

Moving Parts / Fan Maintenance

Check mark

Ensure all safety guards are installed

Check mark

Verify all moving parts have guards to protect personnel

Check mark

Check all setscrews and bolts for tightness during routine maintenance

Check mark

Inspect installation for loose items or debris that could be drawn into the fan or dislodged by the fan discharge

Check mark

Check the interior of the fan

Check mark

Turn the wheel by hand to check for binding

Run this procedureArrow right

V-Belt Drive Inspection

Check mark

Pre-maintenance safety check

Check mark

Ensure electrical supply is completely disconnected and locked out

Check mark

V-Belt Drive Inspection

Check mark

Check the V-belt drive for proper alignment and tension

Check mark

Check belt tension with a tensioning gage

Check mark

Adjust belt tension using the motor slide base

Check mark

Check sheave alignment by placing a straightedge across the faces of the sheaves

Check mark

Check setscrew and/or bushing bolt tightness

Check mark

Belt Condition and Replacement

Run this procedureArrow right

Fan Bolts Tightness Inspection

Check mark

Fan Maintenance

Check mark

Ensure electrical supply is disconnected and locked out

Check mark

Check all setscrews and bolts for tightness

Check mark

Record torque values for setscrews and bolts

Check mark

Recheck wheel, sheave, and coupling setscrews after a few minutes of operation

Check mark

Recheck wheel, sheave, and coupling setscrews after eight hours of operation

Check mark

Recheck wheel, sheave, and coupling setscrews after two weeks of operation

Check mark

Refer to Table 1 for wheel setscrew torques and Table 2 for bearing setscrew torques

Check mark

Shut down fan if there is a sudden increase in vibration

Run this procedureArrow right

Fan Wheel Inspection

Check mark

Fan Maintenance

Check mark

Ensure electrical supply is completely disconnected and locked out

Check mark

Block the rotating assembly securely

Check mark

Inspect the fan wheel for issues

Check mark

Is there any wear or corrosion on the fan wheel?

Check mark

Is there any build-up of material on the fan wheel?

Check mark

Clean or replace the fan wheel as required

Check mark

Ensure the fan hub is not removed or loosened from the fan wheel

Run this procedureArrow right

6 Monthly Shaft Seal Lubrication

Check mark

Fan Maintenance

Check mark

Check the type of shaft seal

Check mark

Replace worn ceramic-felt shaft seals

Check mark

Lubricate lip-type shaft seals with 'NEVER-SEEZ' or other anti-seize compound

Check mark

Schedule lubrication in accordance with the bearing lubrication table on page 5

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from The New York Blower Company

Explore Other Assets