MaintainX Asset Hub logo
EnterprisePricing
The New York Blower Company

The New York Blower Company Blower PLR 12

Need answers fast?
Explore the manual using AI.

The New York Blower Company Blower PLR 12
The New York Blower Company Blower PLR 12

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for The New York Blower Company Blower PLR 12

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

The New York Blower Company Blower PLR 12

The New York Blower Company Blower PLR 12

Create an account to install this asset package.

Maintenance Plans for The New York Blower Company Blower Model PLR 12

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Bearing Lubrication

Check mark

STORAGE — BEARINGS / Storage

Check mark

Purge fan and motor bearings with new grease

Check mark

Rotate the shaft while slowly adding grease

Run this procedureArrow right

Split Pillowblock Bearing Maintenance

Check mark

BEARINGS — Lubrication

Check mark

Identify the bearing type

Check mark

Remove the bearing cap

Check mark

Clean out old grease

Check mark

Repack the bearing with fresh grease

Check mark

Pack the bearing fully and fill the housing reservoir to the bottom of the shaft on both sides of the bearing

Check mark

Replace the bearing cap, ensuring not to mix caps as they are not interchangeable

Check mark

Ensure no over lubrication of split pillowblock bearings

Run this procedureArrow right

Safety Guards Inspection

Check mark

MOVING PARTS / FAN MAINTENANCE

Check mark

Check for damaged or missing guards

Check mark

Ensure all moving parts have guards installed

Check mark

Check setscrews and bolts for tightness

Check mark

Inspect for loose items or debris

Check mark

Check the interior of the fan

Check mark

Turn the wheel by hand to check for binding

Run this procedureArrow right

Fan Bolts Tightness Inspection

Check mark

Fan Maintenance

Check mark

Ensure electrical supply is completely disconnected and locked out

Check mark

Check all setscrews and bolts for tightness

Check mark

Refer to the corresponding table for correct torques

Check mark

Recheck setscrews after operation

Check mark

Refer to Table 1 for wheel setscrew torques

Check mark

Refer to Table 2 for bearing setscrew torques

Check mark

Shut down the fan if there is any sudden increase in fan vibration

Run this procedureArrow right

Coupling Maintenance

Check mark

COUPLING — Alignment

Check mark

Lubricate the coupling of direct-drive units and check for alignment

Check mark

Refer to manufacturer's installation and maintenance supplement for lubrication details and alignment tolerances

Check mark

Recheck alignment and gap after a short period of operation

Check mark

Recheck the tightness of all fasteners in the coupling assembly

Check mark

Check coupling alignment after permanent installation and prior to start up

Check mark

Align the coupling to within the manufacturer's limits for parallel and angular misalignment

Check mark

Post Maintenance Verification

Check mark

Is the coupling aligned within the manufacturer's specified limits?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from The New York Blower Company

Explore Other Assets