MaintainX Asset Hub logo
EnterprisePricing
The New York Blower Company

The New York Blower Company Blower AF-70

Need answers fast?
Explore the manual using AI.

The New York Blower Company Blower AF-70
The New York Blower Company Blower AF-70

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for The New York Blower Company Blower AF-70

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

The New York Blower Company Blower AF-70

The New York Blower Company Blower AF-70

Create an account to install this asset package.

Maintenance Plans for The New York Blower Company Blower Model AF-70

Integrate maintenance plans directly into your work orders in MaintainX.

Coupling Maintenance

Check mark

COUPLING — Alignment

Check mark

Lubricate the coupling of direct-drive units and check for alignment

Check mark

Refer to manufacturer's installation and maintenance supplement for lubrication details and alignment tolerances

Check mark

Recheck alignment and gap after a short period of operation

Check mark

Recheck the tightness of all fasteners in the coupling assembly

Check mark

Check coupling alignment after permanent installation and prior to start up

Check mark

Align the coupling to within the manufacturer's limits for parallel and angular misalignment

Check mark

Post Maintenance Verification

Check mark

Is the coupling aligned within the manufacturer's specified limits?

Run this procedureArrow right

Split Pillowblock Bearing Maintenance

Check mark

BEARINGS — Lubrication

Check mark

Remove the bearing cap

Check mark

Clean out old grease

Check mark

Repack the bearing with fresh grease

Check mark

Pack the bearing fully and fill the housing reservoir to the bottom of the shaft on both sides of the bearing

Check mark

Replace the bearing cap, being careful not to mix caps, as they are not interchangeable from one bearing to another

Check mark

Do not over lubricate split pillowblock bearings

Run this procedureArrow right

Fan Wheel Inspection

Check mark

Fan Maintenance

Check mark

Ensure electrical supply is completely disconnected and locked out

Check mark

Block the rotating assembly securely

Check mark

Inspect the fan wheel for issues

Check mark

Is there any wear or corrosion on the fan wheel?

Check mark

Is there any build-up of material on the fan wheel?

Check mark

Clean or replace the fan wheel as required

Check mark

Ensure the fan hub is not removed or loosened from the fan wheel

Run this procedureArrow right

Initial V-Belt Tension Check

Check mark

V-BELT DRIVE — Belt Tensioning

Check mark

Verify the following components

Check mark

Has the belt tension been rechecked after several days of operation?

Check mark

Inspect if the belts have stretched after installation

Run this procedureArrow right

2 Weekly Bearing Shaft Maintenance

Check mark

STORAGE — BEARINGS / Storage

Check mark

Regrease mounted bearings and wrap with plastic for protection

Check mark

Add additional grease to split housed bearings

Check mark

Rotate the fan wheel and motor shaft by hand

Check mark

Use caution when purging to avoid seal damage

Check mark

Rotate the shaft while slowly adding grease

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from The New York Blower Company

Explore Other Assets