Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Leybold Vacuum Pump TURBOVAC T350iX DN100ISO-K
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Air Filter Maintenance
4.1 Media compatibility / purge gas
Verify media compatibility
Check purge gas type
Change the air filters
Pump Maintenance
4.7 Removing the pump from the system
Shut down the pump and vent as described in Sections 4.4 and 4.5.
Has the pump previously handled hazardous gases?
Implement proper precautionary measures before opening the intake or exhaust connection if hazardous gases were handled.
Observe Safety Information 0.4.6.
Ensure the pump has come to a full stop before disconnecting.
Is the green LED off?
Switch the mains power off and wait until the yellow power LED is off.
Disconnect any cable connections.
Cooling Water Quality Check
Water Appearance Check
Measure suspended matter concentration
Measure particle size
Measure electrical conductivity
Measure pH value
Measure total hardness
Check for aggressive carbon dioxide presence
Measure chloride concentration
Measure sulphate concentration
Bearing Maintenance
Maintenance
Determine if bearing replacement is required
Contact after sales service for on-site bearing replacement
Request a quotation for bearing replacement at Leybold Service Center
Pump Leak Testing
0.4 Hazards caused by materials and substances
Ensure the forevacuum line is tight
Check for potential leaks where hazardous gases can escape
Verify the pump's integral leak rate is < 1·10-8 mbar·l/s upon delivery
Conduct a leak search after installing the pump or performing service work
Perform regular leak searches when pumping toxic gases
Access the parts list for your equipment in MaintainX.
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX