Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump 3355 2.5 x 4-8A-3600
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Mechanical Seal Inspection
Mechanical-seal maintenance
Check the seal and all flush piping before starting the pump
Ensure the cleanliness of the pumped fluid
Verify the installation of cartridge-type mechanical seals
Disengage holding clips of user-installed cartridge seals before operation
Keep the manufacturer's reference drawing for future maintenance
Verify the required flush fluid and attachment points as per the seal drawing
Pump Startup Check
5.1 Preparation for startup
Flush and clean the system thoroughly to remove dirt or debris in the pipe system.
Will the temperatures of the pumped fluid exceed 93°C | 200°F?
Warm up the pump prior to operation if fluid temperatures exceed 93°C | 200°F.
Circulate a small amount of fluid through the pump until the casing temperature is within 38°C | 100°F of the fluid temperature.
Soak for 2 hours at process fluid temperature.
Bring variable-speed drivers to the rated speed as quickly as possible.
Ensure set screws in the seal locking ring are tightened and centering clips are removed prior to startup.
Verify the following before starting the pump
3 Monthly Pump Storage Maintenance
2.3.2 Pump storage requirements
Ensure the unit is stored properly
Rotate the shaft by hand several times
1 Yearly Pump Performance Inspection
6.1 Maintenance schedule — Annual inspections
Record the pump capacity
Record the pump pressure
Record the pump power
Does the pump performance satisfy process requirements?
Is the pumped fluid abrasive or corrosive, or is the environment potentially explosive?
After Maintenance Bearing Lubrication
6.2.5 Lubricate the bearings after a shutdown period
Flush out the bearings and bearing frame with a light oil to remove contaminants
Flush the bearing housing with the proper lubricating oil to ensure oil quality after cleaning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX