MaintainX Asset Hub logo
EnterprisePricing
Flowserve

Flowserve Pump 10-MFV-18

Need answers fast?
Explore the manual using AI.

Flowserve Pump 10-MFV-18
Flowserve Pump 10-MFV-18

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Flowserve Pump 10-MFV-18

Flowserve Pump 10-MFV-18

Create an account to install this asset package.

Maintenance Plans for Flowserve Pump Model 10-MFV-18

Integrate maintenance plans directly into your work orders in MaintainX.

Shaft Inspection

Check mark

6.1.7 Maintenance of shaft and shaft sleeve

Check mark

Examine the shaft condition at the following locations

Check mark

Is there any rusting or pitting on the shaft?

Check mark

Are the anti-friction bearings properly fitted to the pump shaft?

Check mark

Is there any distortion in the shaft keyways?

Check mark

Is the impeller loose on the shaft?

Check mark

Is the shaft bent or distorted?

Check mark

Is the wear on the shaft slight enough for repair by metal spraying or plating?

Check mark

Measure the shaft runout after repair (maximum 0.051 mm T.I.R.)

Run this procedureArrow right

Pump Maintenance

Check mark

6.7 Disassembly

Check mark

Refer to section 1.6, Safety, before dismantling the pump

Check mark

Ensure genuine Flowserve replacement parts are available

Check mark

Refer to sectional drawings for part reference numbers

Check mark

6.7.1 Preliminary to dismantling

Check mark

Isolate motor and lock off electrical supply in accordance with local regulations

Check mark

Isolate suction and discharge valves

Check mark

Remove coupling guards and disconnect the coupling halves

Check mark

Drain pump casing and remove any auxiliary piping if applicable

Run this procedureArrow right

1 Daily Pump Inspection

Check mark

Routine inspection (daily/weekly)

Check mark

Check operating behavior

Check mark

Check for abnormal fluid or lubricant leaks

Check mark

Check shaft seal leaks

Check mark

Check oil lubricant level and condition

Check mark

Check auxiliary supplies

Run this procedureArrow right

Initial Pump Bearing Lubrication

Check mark

Pump Lubricants

Check mark

Determine the mode of lubrication of the pump set

Check mark

Are the pumps and electric motors pre-greased?

Check mark

Bearings – Grease Lubricated

Check mark

Check the bearing frame cavities for grease and add grease as necessary

Check mark

Remove the grease fittings or pipe plug closest to the cover after start-up to allow excess grease to flow out

Check mark

Monitor the bearing temperatures until they return to normal

Check mark

Investigate any marked increase in bearing temperature after normal operation

Check mark

Recommended Grease Lubricants

Run this procedureArrow right

Gland Packing Maintenance

Check mark

6.1.8 Maintenance of packing

Check mark

Use a good grade of non-asbestos packing with a high temperature surface lubricant for packing the stuffing box.

Check mark

Ensure flax packing is not used to prevent rapid wear of the shaft sleeve.

Check mark

Repacking the stuffing box

Check mark

Remove the stuffing box gland.

Check mark

Remove the old packing and seal cage halves and clean the stuffing box.

Check mark

Verify the packing to be used is of the correct type and size.

Check mark

Measure the stuffing box to determine the proper length of packing.

Check mark

Cut packing slightly shorter than measured to prevent butting of the ends and buckling.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Flowserve

Explore Other Assets