Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Unit Cooling Only Air Conditioner RN35JV1G
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Capillary Tube Removal
Safety Precautions
Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Ensure proper ventilation if refrigerant gas leaks during work.
Collect all refrigerant gas to avoid atmospheric discharge.
Preparation
Ensure refrigerant gas is empty in the circuit.
Apply nitrogen replacement when heating up the brazed part.
Provide a protective sheet or steel plate to shield peripheries from brazing flame.
Disassembly
Compressor ASSY Removal
Safety Precautions
Wait for 10 minutes or more after turning off all power supplies before starting disassembly.
Ensure pipes and other parts heated by the gas brazing machine are cool to avoid burns.
Is the room ventilated in case of refrigerant gas leakage?
Prepare wet cloth to extinguish fire immediately in case refrigerant oil catches fire.
Environmental Cautions
Ensure refrigerant gas is not discharged into the atmosphere and is collected properly.
Restore piping using non-oxidation brazing.
Preparation Notes
Outer Panels / Fan Motor Removal
Preliminary Safety Measures
Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the Outer Panels
Remove the screw and remove the stop valve cover.
Remove the 3 screws and remove the top panel.
Remove the 4 screws and remove the discharge grille.
Remove the 8 screws of the front panel.
Unfasten the 4 hooks and remove the front panel.
Remove the Fan Motor
Electrical Component / Sound Blanket Removal
Pre-removal Safety Check
Have all power supplies been turned off for at least 10 minutes?
Electrical Component Removal
Remove the electrical components
Compressor lead wire colors
Sound Blanket Removal
Remove the sound blanket (top) carefully
Untie the 2 strings and remove the sound blanket (body)
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













