MaintainX Asset Hub logo
EnterprisePricing
CDR Pompe

CDR Pompe Pump UCL 80-50-200 50 Hz

Need answers fast?
Explore the manual using AI.

CDR Pompe Pump UCL 80-50-200 50 Hz
CDR Pompe Pump UCL 80-50-200 50 Hz

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for CDR Pompe Pump UCL 80-50-200 50 Hz

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

CDR Pompe Pump UCL 80-50-200 50 Hz

CDR Pompe Pump UCL 80-50-200 50 Hz

Create an account to install this asset package.

Maintenance Plans for CDR Pompe Pump Model UCL 80-50-200 50 Hz

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Storage Maintenance

Check mark

3.5 Storage

Check mark

Store the pump in a covered and dry location

Check mark

Keep the pump in its original packaging

Check mark

Ensure protection caps and lids of the flanges remain on the pump until installation

Check mark

Is the pump stored for a long period or in severe weather conditions?

Check mark

If yes, take additional protective measures

Run this procedureArrow right

4300 Hourly Oil Change

Check mark

9.4 Oil change

Check mark

Record the current bearing bracket temperature

Check mark

Is the bearing bracket temperature between 70°C and 80°C?

Check mark

Ensure the lubricant used has a viscosity of 46Cst

Check mark

Verify application limits and room temperature

Check mark

Monitor the bearing temperature for pumps in explosive environments

Check mark

Describe any excessive temperature increases observed

Run this procedureArrow right

Pump Startup Check

Check mark

5.1 Pre-start checklist

Check mark

Ensure the following conditions are met before starting the pump

Check mark

Is the suction pipe filled and the foot valve working properly to prevent backflow?

Check mark

Does the motor turn in the same direction as the arrow shown on the pump?

Check mark

Does the motor fan turn clockwise?

Check mark

Check that the motor rotates freely by hand

Check mark

Is the liquid kept at the required temperature to prevent crystallization or solidification?

Check mark

Ensure auxiliary connections are connected and working

Check mark

Is the flushing liquid pressure in compliance with the seal manual?

Run this procedureArrow right

Initial Pump-Motor Alignment Check

Check mark

4.6.2 Checking alignment

Check mark

Check alignment before commissioning or after maintenance

Check mark

Ensure motor is stopped and in safety before checking alignment

Check mark

Tools needed for alignment

Check mark

Leave the pump in its position and only move the motor?

Check mark

Motor Adjustment

Check mark

Motor fixing type

Check mark

Loosen the bolts of the motor feet if fixed directly to the base

Check mark

Loosen the bolts securing the motor plate to the threaded columns if fixed on an adjustable plate

Run this procedureArrow right

Oiler Lubrication

Check mark

9.4.1 Filling the oiler (if supplied)

Check mark

Tilt the oiler bowl (638)

Check mark

Fill the oiler bowl with oil

Check mark

Release the bowl so that it returns to vertical position

Check mark

Is the oil level too low?

Check mark

Top up the bowl if the oil level is too low

Check mark

Ensure the bearing bracket is not filled with oil through the connection in the oiler

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from CDR Pompe

Explore Other Assets