Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 25-25-160 60 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
8600 Hourly Oil Change
9.4 Oil change
Verify the following conditions before proceeding
Record the current bearing temperature
Is the bearing temperature within safe limits for explosive environments?
Change the oil using the specified lubricant
Describe any unusual observations during the oil change
Pump Storage Maintenance
3.5 Storage
Ensure proper storage conditions for the pump
Ensure protection caps and lids of the flanges remain on the pump until installation
Is the pump stored for a long period or in severe weather conditions?
If stored for a long period or in severe conditions, ensure additional protective measures
1 Monthly Pump Maintenance
Measures to take for periods of long inactivity
Periodically start the pump for about five minutes (about once a month) to prevent sediment formation.
Did you run the pump for at least once a month or once every three months for approximately 5-10 mins?
Running the pump after a long period of stop
Review the entire section 'Starting and stopping' and the section 'Maintenance' before restarting the pump.
Follow these suggestions based on the period of inactivity
Fill the pump with inert gas when draining if electrically charged liquids were used.
Wait at least one hour before removing the pump from the plant to allow electrostatic charges to dissipate.
Initial 300 Hours Oil Change
Oil change
Check the oil level using the 'spy' cap
Ensure the oil level corresponds to the center of the warning light
Select the lubricant brand used
Measure and add 300 gr of lubricant for the 1st bracket
Measure and add 900 gr of lubricant for the 2nd bracket
Pump Maintenance
General Information
Ensure all safety precautions are followed
Volute Casing Assembly
Choose the method for volute casing removal
If removing the entire pump, perform the following
If leaving the volute casing connected, perform the following
Impeller Disassembly
Perform the following steps for impeller disassembly
Shaft Sleeve Disassembly
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX