MaintainX Asset Hub logo
EnterprisePricing
CDR Pompe

CDR Pompe Pump UCL 25-25-160 60 Hz

Need answers fast?
Explore the manual using AI.

CDR Pompe Pump UCL 25-25-160 60 Hz
CDR Pompe Pump UCL 25-25-160 60 Hz

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for CDR Pompe Pump UCL 25-25-160 60 Hz

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

CDR Pompe Pump UCL 25-25-160 60 Hz

CDR Pompe Pump UCL 25-25-160 60 Hz

Create an account to install this asset package.

Maintenance Plans for CDR Pompe Pump Model UCL 25-25-160 60 Hz

Integrate maintenance plans directly into your work orders in MaintainX.

8600 Hourly Oil Change

Check mark

9.4 Oil change

Check mark

Verify the following conditions before proceeding

Check mark

Record the current bearing temperature

Check mark

Is the bearing temperature within safe limits for explosive environments?

Check mark

Change the oil using the specified lubricant

Check mark

Describe any unusual observations during the oil change

Run this procedureArrow right

Pump Storage Maintenance

Check mark

3.5 Storage

Check mark

Ensure proper storage conditions for the pump

Check mark

Ensure protection caps and lids of the flanges remain on the pump until installation

Check mark

Is the pump stored for a long period or in severe weather conditions?

Check mark

If stored for a long period or in severe conditions, ensure additional protective measures

Run this procedureArrow right

1 Monthly Pump Maintenance

Check mark

Measures to take for periods of long inactivity

Check mark

Periodically start the pump for about five minutes (about once a month) to prevent sediment formation.

Check mark

Did you run the pump for at least once a month or once every three months for approximately 5-10 mins?

Check mark

Running the pump after a long period of stop

Check mark

Review the entire section 'Starting and stopping' and the section 'Maintenance' before restarting the pump.

Check mark

Follow these suggestions based on the period of inactivity

Check mark

Fill the pump with inert gas when draining if electrically charged liquids were used.

Check mark

Wait at least one hour before removing the pump from the plant to allow electrostatic charges to dissipate.

Run this procedureArrow right

Initial 300 Hours Oil Change

Check mark

Oil change

Check mark

Check the oil level using the 'spy' cap

Check mark

Ensure the oil level corresponds to the center of the warning light

Check mark

Select the lubricant brand used

Check mark

Measure and add 300 gr of lubricant for the 1st bracket

Check mark

Measure and add 900 gr of lubricant for the 2nd bracket

Run this procedureArrow right

Pump Maintenance

Check mark

General Information

Check mark

Ensure all safety precautions are followed

Check mark

Volute Casing Assembly

Check mark

Choose the method for volute casing removal

Check mark

If removing the entire pump, perform the following

Check mark

If leaving the volute casing connected, perform the following

Check mark

Impeller Disassembly

Check mark

Perform the following steps for impeller disassembly

Check mark

Shaft Sleeve Disassembly

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from CDR Pompe

Explore Other Assets