

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 65-40-160 60 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
8600 Hourly Oil Change
9.4 Oil change
Verify lubricant specifications
Record the bearing bracket temperature
Is the bearing temperature within safe limits?
Change the oil
Describe any observed temperature changes during the oil change
Initial 300 Hours Oil Change
9.4 Oil Change
Verify lubricant type and quantity
Check standard supply of lubricated rolling bearings
Check oil level using the 'spy' cap to ensure it corresponds to the center of the warning light
Confirm suitable lubricant brand used
Initial Pump-Motor Alignment Check
Checking alignment
Check alignment before commissioning or after maintenance
Ensure motor is stopped and in safety before checking alignment
Tools needed for alignment
Leave pump in position and move motor for alignment
Loosen bolts of motor feet for motors fixed directly to the base
Loosen bolts securing motor plate to threaded columns for motors on adjustable plate
Adjust motor height by inserting or removing thin metal sheets or adjusting threaded screws
Make horizontal adjustments with lateral movements
1 Monthly Pump Maintenance
Measures to take for periods of long inactivity
Periodically start the pump for about five minutes (about once a month)
Did you run the pump for at least 5-10 minutes?
Running the pump after a long period of stop
Review the section 'Starting and stopping' and the section 'Maintenance'
Fill the pump with inert gas if electrically charged liquids were used
Wait at least one hour before removing the pump from the plant
Recommendations for up to one year of inactivity
Recommendations for beyond one year of inactivity
Pump Maintenance
General Information
Ensure all work is performed by authorized personnel only
Pre-maintenance safety checks
Volute Casing Assembly
Choose method for volute casing removal
Steps for removing entire pump
Steps for leaving volute casing connected
Impeller Disassembly
Impeller disassembly steps
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













