MaintainX Asset Hub logo
EnterprisePricing
CDR Pompe

CDR Pompe Pump UCL 80-50-125 60 Hz

Need answers fast?
Explore the manual using AI.

CDR Pompe Pump UCL 80-50-125 60 Hz
CDR Pompe Pump UCL 80-50-125 60 Hz

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for CDR Pompe Pump UCL 80-50-125 60 Hz

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

CDR Pompe Pump UCL 80-50-125 60 Hz

CDR Pompe Pump UCL 80-50-125 60 Hz

Create an account to install this asset package.

Maintenance Plans for CDR Pompe Pump Model UCL 80-50-125 60 Hz

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Pump-Motor Alignment Check

Check mark

Checking alignment

Check mark

Check alignment before commissioning or after maintenance

Check mark

Ensure motor is stopped and in safety before checking alignment

Check mark

Tools needed for alignment

Check mark

Leave pump in position and move motor for alignment

Check mark

Loosen bolts of motor feet for motors fixed directly to the base

Check mark

Loosen bolts securing motor plate for motors on adjustable plate

Check mark

Block motor by tightening bolts after satisfactory alignment

Check mark

Align pump-motor unit in all directions

Run this procedureArrow right

2100 Hourly Oil Change

Check mark

9.4 Oil change

Check mark

Ensure the following conditions are met before proceeding

Check mark

Record the current bearing temperature

Check mark

Is the bearing temperature within the safe range for explosive environments?

Check mark

Change the oil using the specified lubricant

Check mark

Monitor the bearing temperature after oil change

Check mark

Describe any unusual temperature changes or issues observed during the procedure

Run this procedureArrow right

Initial 300 Hours Oil Change

Check mark

9.4 Oil change

Check mark

Verify lubricant type and quantity

Check mark

Check standard supply of lubricated rolling bearings

Check mark

Check oil level corresponds to the center of the warning light

Check mark

Confirm suitable lubricant brand used

Run this procedureArrow right

Pump Maintenance

Check mark

General Information

Check mark

Ensure the following precautions are taken before starting maintenance

Check mark

Volute Casing Assembly

Check mark

Choose the method for removing the volute casing

Check mark

If removing the entire pump, perform the following steps

Check mark

If leaving the volute casing connected, perform the following steps

Check mark

Impeller Disassembly

Check mark

Perform the following steps for impeller disassembly

Check mark

Shaft Sleeve Disassembly

Run this procedureArrow right

4300 Hourly Oil Change

Check mark

9.4 Oil change

Check mark

Record the current bearing bracket temperature

Check mark

Is the bearing bracket temperature between 70°C and 80°C?

Check mark

Ensure the lubricant used has a viscosity of 46Cst

Check mark

Verify application limits and room temperature

Check mark

Monitor the bearing temperature for pumps in explosive environments

Check mark

Describe any excessive temperature increases observed

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from CDR Pompe

Explore Other Assets