Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 50-32-160 50 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Maintenance
8.1 General information
Ensure the following safety measures are taken before maintenance
8.2.1 Volute casing assembly
Choose the method for volute casing removal
If removing the entire pump, perform the following steps
If leaving the volute casing connected, perform the following steps
8.2.2 Impeller disassembly
Perform the following steps for impeller disassembly
8.2.3 Shaft sleeve disassembly
Initial Pump-Motor Alignment Check
4.6.2 Checking alignment
Check alignment before commissioning or after maintenance
Ensure motor is stopped and in safety before checking alignment
Tools needed for alignment
Is the pump left in its position and only the motor moved?
Align pump-motor unit in all directions
Motor Adjustment
Motor fixing type
Loosen bolts of the motor feet if fixed directly to the base
Pump Startup Check
5.1 Pre-start checklist
Ensure the following pre-start conditions are met
Is the suction pipe filled and foot valve working properly?
Verify motor and pump conditions
Is the liquid temperature maintained to prevent crystallization or solidification?
Check auxiliary connections
Is the oil level adequate for pumps with oil lubricated bearing bracket?
5.2 Mechanical seal
Are the operating and functional parameters of the mechanical seal followed as per Data Sheet?
Pump Inspection
9.1 Maintenance interval
Describe the maintenance interval based on the pump's working point and characteristic curve
Is the pump unit kept in perfect technical condition?
9.2 Parts to be checked
Bearing bracket (Code 330) checks
Is the alignment of the elastic coupling between pump and motor correct?
Is the pump execution correct?
Impeller (Code 230) checks
Volute casing (Code 102) / Stuffing box housing (Code 451) checks
2100 Hourly Oil Change
9.4 Oil change
Ensure the following conditions are met before proceeding
Record the current bearing temperature
Is the bearing temperature within the safe range for explosive environments?
Change the oil using the specified lubricant
Describe any abnormalities observed during the oil change
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX