Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 125-80-200 50 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Storage Maintenance
3.5 Storage
Ensure the pump is stored correctly
Verify protection caps and lids of the flanges are on the pump
Is the pump stored for a long period or in severe conditions?
If stored for a long period or in severe conditions, ensure additional precautions are taken
Pump Inspection
9.1 Maintenance interval
Confirm maintenance interval adherence
9.2 Parts to be checked
Bearing bracket (Code 330)
Impeller (Code 230)
Volute casing (Code 102) / Stuffing box housing (Code 451)
Check components for replacement
9.3 Bearing bracket and bearing life
Measure vibrations
Pump Startup Check
5.1 Pre-start checklist
Ensure the following pre-start conditions are met
Is the suction pipe filled and foot valve working properly?
Verify motor and pump conditions
Is the liquid temperature maintained to prevent crystallization or solidification?
Check auxiliary connections
Is the oil level adequate for pumps with oil lubricated bearing bracket?
5.2 Mechanical seal
Ensure operating and functional parameters of the mechanical seal are followed as per Data Sheet
Pump Maintenance
General Information
Ensure the following safety measures are taken before maintenance
Volute Casing Assembly
Choose the method for removing the volute casing
If removing the entire pump, perform the following steps
If leaving the volute casing connected, perform the following steps
Impeller Disassembly
Perform the following steps for impeller disassembly
Shaft Sleeve Disassembly
2100 Hourly Oil Change
9.4 Oil change
Record the current bearing bracket temperature
Is the bearing bracket temperature between 80°C and 90°C?
Ensure the lubricant used has a viscosity of 46Cst
Verify application limits and room temperature
Monitor the bearing temperature for pumps in explosive environments
Describe any observed excessive temperature increase
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX