Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 50-32-200 50 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Pump Maintenance
Measures to take for periods of long inactivity
Periodically start the pump for about five minutes (about once a month) to prevent sediment formation.
Did you run the pump for at least 5-10 minutes this month?
Running the pump after a long period of stop
Review the entire section 'Starting and stopping' and the section 'Maintenance' before restarting the pump.
Recommendations for pumps inactive up to one year
Additional recommendations for pumps inactive beyond one year
Fill the pump with inert gas when draining if electrically charged liquids were used.
Wait at least one hour before removing the pump from the plant to allow electrostatic charges to dissipate.
4300 Hourly Oil Change
9.4 Oil change
Verify the following conditions before proceeding
Use lubricant with viscosity of 46Cst
Is the pump installed in an environment with an explosion hazard?
Record the bearing temperature
Ensure no excessive increase in temperature is observed
Describe any unusual observations during the oil change
2100 Hourly Oil Change
9.4 Oil change
Verify the following conditions before proceeding
Use lubricant with viscosity of 46Cst
Is the pump installed in an environment with an explosion hazard?
Monitor the bearing temperature during operation
Check for excessive increase in temperature
Pump Inspection
9.1 Maintenance interval
Ensure pump unit undergoes proper maintenance at regular intervals
Consider working point of the pump referred to the characteristic curve
Consider circumstances such as intermittent operation, characteristics of the pumped fluid, and installation in a system
9.2 Parts to be checked
Check components that may impair pump operation if not replaced regularly
Bearing bracket (Code 330)
Is the bearing bracket over temperature?
Check the alignment of the elastic coupling between pump and motor
Pump Startup Check
5.1 Pre-start checklist
Ensure the following pre-start conditions are met
Is the suction pipe filled and foot valve working properly?
Verify motor and pump conditions
Is the liquid temperature maintained to prevent crystallization or solidification?
Check auxiliary connections
Is the oil level adequate for pumps with oil lubricated bearing bracket?
5.2 Mechanical seal
Ensure operating and functional parameters of the mechanical seal are followed
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX