MaintainX Asset Hub logo
EnterprisePricing
CDR Pompe

CDR Pompe Pump UCL 80-50-160 60 Hz

Need answers fast?
Explore the manual using AI.

CDR Pompe Pump UCL 80-50-160 60 Hz
CDR Pompe Pump UCL 80-50-160 60 Hz

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for CDR Pompe Pump UCL 80-50-160 60 Hz

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

CDR Pompe Pump UCL 80-50-160 60 Hz

CDR Pompe Pump UCL 80-50-160 60 Hz

Create an account to install this asset package.

Maintenance Plans for CDR Pompe Pump Model UCL 80-50-160 60 Hz

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Pump Maintenance

Check mark

Measures to take for periods of long inactivity

Check mark

Periodically start the pump for about five minutes (about once a month)

Check mark

Did you run the pump for at least 5-10 minutes?

Check mark

Running the pump after a long period of stop

Check mark

Review the section 'Starting and stopping' and the section 'Maintenance'

Check mark

Follow these suggestions based on the period of inactivity

Check mark

Was the pump filled with inert gas when draining electrically charged liquids?

Check mark

Wait at least one hour before removing the pump from the plant to allow electrostatic charges to dissipate

Run this procedureArrow right

2100 Hourly Oil Change

Check mark

9.4 Oil change

Check mark

Record the current bearing bracket temperature

Check mark

Is the bearing bracket temperature between 80°C and 90°C?

Check mark

Use lubricant with viscosity of 46Cst

Check mark

Record the room temperature

Check mark

Is the room temperature between -15°C and 40°C?

Check mark

Monitor the bearing temperature for pumps in explosive environments

Check mark

Describe any observed excessive temperature increase

Run this procedureArrow right

Pump Storage Maintenance

Check mark

3.5 Storage

Check mark

Ensure proper storage conditions

Check mark

Ensure protection caps and lids of the flanges remain on the pump until installation

Check mark

Is the pump stored for a long period or in severe weather conditions?

Check mark

Recommended actions for long-term or severe condition storage

Run this procedureArrow right

Oiler Lubrication

Check mark

9.4.1 Filling the oiler (if supplied)

Check mark

Tilt the oiler bowl (638)

Check mark

Fill the oiler bowl with oil

Check mark

Release the bowl so that it returns to vertical position

Check mark

Is the oil level too low?

Check mark

Top up the bowl if the oil level is too low

Check mark

Ensure the bearing bracket is not filled with oil through the connection in the oiler

Run this procedureArrow right

Pump Maintenance

Check mark

8.1 General information

Check mark

Ensure the following safety measures are taken before maintenance

Check mark

8.2.1 Volute casing assembly

Check mark

Choose the method for volute casing removal

Check mark

If removing the entire pump, perform the following steps

Check mark

If leaving the volute casing connected, perform the following steps

Check mark

8.2.2 Impeller disassembly

Check mark

Perform the following steps for impeller disassembly

Check mark

8.2.3 Shaft sleeve disassembly

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from CDR Pompe

Explore Other Assets