

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

CDR Pompe Pump UCL 80-50-160 50 Hz
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 300 Hours Oil Change
9.4 Oil Change
Verify lubricant type and application limits
Check lubricant quantity for each bracket
Verify bearing types
Check oil level corresponds to the center of the warning light
Confirm suitable lubricant brand used
Initial Pump-Motor Alignment Check
4.6.2 Checking alignment
Check alignment conditions
Ensure motor is stopped and in safety before checking alignment
Gather necessary tools for alignment
Is the pump left in its position and only the motor moved?
Align pump-motor unit in all directions
Motor Adjustment
For motors fixed directly to the base, loosen the bolts of the motor feet
For motors fixed on an adjustable plate, loosen the bolts securing the motor plate to the respective threaded columns
8600 Hourly Oil Change
9.4 Oil change
Verify the following conditions before proceeding
Record the current bearing temperature
Is the bearing temperature within safe limits for explosive environments?
Change the oil using the specified lubricant
Describe any unusual observations during the oil change
Pump Startup Check
5.1 Pre-start checklist
Ensure the following pre-start conditions are met
Is the suction pipe filled and foot valve working properly?
Verify motor and pump conditions
Ensure auxiliary connections are working
Is the oil level adequate for pumps with oil lubricated bearing bracket?
5.2 Mechanical seal
Ensure operating and functional parameters of the mechanical seal are followed
Ensure all safety devices of the pump are enabled
Pump Storage Maintenance
3.5 Storage
Ensure the pump is stored correctly
Verify protection caps and lids of the flanges are on the pump
Is the pump stored for a long period or in severe conditions?
If stored for a long period or in severe conditions, ensure additional precautions are taken
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













