MaintainX Asset Hub logo
EnterprisePricing
C. & E. Fein

C. & E. Fein Oscillating Multi-Tool FMT250QSL

Need answers fast?
Explore the manual using AI.

C. & E. Fein Oscillating Multi-Tool FMT250QSL
C. & E. Fein Oscillating Multi-Tool FMT250QSL

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for C. & E. Fein Oscillating Multi-Tool FMT250QSL

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

C. & E. Fein Oscillating Multi-Tool FMT250QSL

C. & E. Fein Oscillating Multi-Tool FMT250QSL

Create an account to install this asset package.

Maintenance Plans for C. & E. Fein Oscillating Multi-Tool Model FMT250QSL

Integrate maintenance plans directly into your work orders in MaintainX.

Carbon Brush Holder / Carbon Brush Assembly

Check mark

Position the two connectors

Check mark

Position brush holders

Check mark

Secure brush holders with the two screws

Check mark

Slide the two carbon brushes into brush holders and connect to appropriate connector

Check mark

Place spring on carbon brush

Check mark

Connect cables to distributors

Run this procedureArrow right

Stator Assembly

Check mark

Cable and Field Coil Installation

Check mark

Connect connecting cables to stator as shown in illustration.

Check mark

Insert cables into field coil.

Check mark

Insert field coil in motor housing ensuring ID number of the stator is on the same side as the switch.

Check mark

Cable Management and Securing

Check mark

Using hook, pull cables out of stator.

Check mark

Screw in the two screws to secure the stator

Check mark

Final Assembly

Check mark

Insert air guide ring.

Run this procedureArrow right

Carbon Brush Disassembly

Check mark

Spring and Carbon Brush Removal

Check mark

Raise spring and lift into cut-out

Check mark

Disconnect and remove carbon brushes on both sides

Check mark

Carbon Holder and Connector Removal

Check mark

Unscrew the two screws and remove carbon holder

Check mark

Pull off cables and remove the two connectors

Run this procedureArrow right

Housing Disassembly

Check mark

Initial Disassembly

Check mark

Unscrew two screws (1)

Check mark

Remove stator (2) from housing

Check mark

Remove the control rod (3)

Check mark

Component Removal

Check mark

Remove slide switch (1)

Check mark

Remove contact spring (2)

Check mark

Pull connecting cables (3) off stator

Run this procedureArrow right

Electronic Disassembly

Check mark

Initial Disassembly

Check mark

Remove the screws and cover

Check mark

Unscrew screw (3) and remove cable clamping piece

Check mark

Electronics Removal

Check mark

Remove electronics (4) from motor housing

Check mark

Disconnect screw connections (5) between motor and electronics

Check mark

Final Disassembly

Check mark

Open screws and remove cable with plug

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from C. & E. Fein

Explore Other Assets