

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

American Panel Shock Freezer AP20BC(F)200-2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Shock Freezer Maintenance
Defrost the unit daily or as needed
Cleaning
Wipe clean the interior of the unit using a solution of mild soap and water
Wipe clean the exterior of the unit using a solution of mild soap and water
Wipe clean the door gasket
Engage the sanitation cycle (if equipped)
1 Yearly Optional Sanitizing Ozone Generator Lamp Replacement
Disconnect the unit from the main electrical power
Open the evaporator door
Remove the screws on the right-hand side of the evaporator door
Open the evaporator door
Remove the old lamp
Gently push the lamp from the bottom side until enough of it is to grab
Extract the lamp from the top and disconnect the wire harness
Replace the lamp
Close and secure the evaporator door
3 Monthly Shock Freezer Maintenance
Inspect components for proper operation and seal
Coil Cleaning
Use vacuum and brush to clean the condenser coil
Clean the evaporator coil
Post Maintenance
Was the maintenance performed by a service technician or trained personnel?
Technician's Signature
1 Yearly Shock Freezer Maintenance
Verify Unit Installation
Ensure unit is properly installed
Verify electrical service according to manufacturer label
Drain Pan and Lines Inspection
Verify proper drain pan installation or hard plumbed
Inspect drain lines for integrity and proper flow
Door and Gasket Check
Check door hinges and gasket for proper operation and seal
Clean door gasket with mild soapy warm water
3 Monthly Evaporator Coil Cleaning
Preparation
Run the defrost cycle to ensure the coil is free of ice.
Disconnect and lock the main power switch.
Evaporator Door Access
Remove screws securing the evaporator door to the vertical frame.
Swing the evaporator door open.
Cleaning Process
Use a vacuum cleaner or soft non-metallic bristle brush to remove surface fibers and dirt in the direction of the fins.
Spray the coil finned area and return bends with recommended coil cleaner using a pump-up sprayer or conventional spray bottle.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













