MaintainX Asset Hub logo
EnterprisePricing
Krowne

Krowne Pass Thru Back Bar Cooler KPT84L

Need answers fast?
Explore the manual using AI.

Krowne Pass Thru Back Bar Cooler KPT84L
Krowne Pass Thru Back Bar Cooler KPT84L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Krowne Pass Thru Back Bar Cooler KPT84L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Krowne Pass Thru Back Bar Cooler KPT84L

Krowne Pass Thru Back Bar Cooler KPT84L

Create an account to install this asset package.

Maintenance Plans for Krowne Pass Thru Back Bar Cooler Model KPT84L

Integrate maintenance plans directly into your work orders in MaintainX.

Shelving Adjustment

Check mark

Remove Shelving

Check mark

Locate the pilaster clip

Check mark

Apply pressure to the bottom of the clip and slide out to remove

Check mark

Align Clips

Check mark

Set desired height using the numbered slots on the pilaster strips

Check mark

Adjust all clips to the same number on the pilaster strips

Check mark

Insert Clips

Check mark

Insert the top part of the clip into the slot

Check mark

Apply pressure to the bottom half of the clip until the clip snaps into place

Run this procedureArrow right

LED Light Change

Check mark

Power Down and Remove Existing Light

Check mark

Power down the unit

Check mark

Remove the 1/4” hex screws

Check mark

Remove and Prepare Wires

Check mark

Remove the existing light

Check mark

Cut off both wire caps

Check mark

Reconnect New Light

Check mark

Reconnect wires with wires from the new light

Check mark

Reattach the electrical connector to the new wires

Run this procedureArrow right

Swing Door Change

Check mark

Removing the Stainless Steel Top

Check mark

Does the unit have a stainless steel top?

Check mark

Locate hex screws on the underside of the stainless steel top and unscrew with a 1/4” hex screwdriver.

Check mark

Unscrew the (3) 3/8” hex screws located on the top frame of each door using a 3/8” hex screwdriver.

Check mark

Lift stainless steel top up to remove.

Check mark

Door Removal

Check mark

Ensure assistance is available to prevent doors from dropping rapidly when the top is removed.

Check mark

Installing New Door

Check mark

Select the type of unit top

Run this procedureArrow right

Door Handle Change

Check mark

Remove Existing Handle

Check mark

Remove the eight 32 x 1/2” Phillips head screws from the top and bottom bracket of the existing door handle.

Check mark

Remove the handle and set the screws aside for reuse.

Check mark

Assemble New Handle

Check mark

Slide the handle rod into the bottom bracket and top bracket.

Check mark

Insert the lock at an angle into the slot on the backside of the top bracket.

Check mark

Turn the lock counter clockwise until it falls into place. Is the lock positioned facing down?

Check mark

Install New Handle

Check mark

Align the top bracket with the holes on the top of the door and secure with existing screws.

Run this procedureArrow right

Stainless Steel Top Change

Check mark

Front Hex Screws

Check mark

Locate the 1/4” hex screws on the front of the unit.

Check mark

Remove the 1/4” hex screws on the front of the unit above the doors and set them aside.

Check mark

Back Hex Screws

Check mark

Locate the 1/4” hex screws on the back of the unit.

Check mark

Remove the 1/4” hex screws on the back of the unit and set them aside.

Check mark

Top Replacement

Check mark

Was the existing stainless steel top lifted off with 2 or more people?

Check mark

Place the new stainless steel top on the unit.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Krowne

Explore Other Assets