MaintainX Asset Hub logo
EnterprisePricing
Krowne

Krowne Direct Draw Cooler DB84

Need answers fast?
Explore the manual using AI.

Krowne Direct Draw Cooler DB84
Krowne Direct Draw Cooler DB84

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Krowne Direct Draw Cooler DB84

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Krowne Direct Draw Cooler DB84

Krowne Direct Draw Cooler DB84

Create an account to install this asset package.

Maintenance Plans for Krowne Direct Draw Cooler Model DB84

Integrate maintenance plans directly into your work orders in MaintainX.

Swing Door Change

Check mark

Removing the Stainless Steel Top

Check mark

Does the unit have a stainless steel top?

Check mark

Locate hex screws on the underside of the stainless steel top and unscrew with a 1/4” hex screwdriver.

Check mark

Unscrew the (3) 3/8” hex screws located on the top frame of each door using a 3/8” hex screwdriver.

Check mark

Lift stainless steel top up to remove.

Check mark

Installing the New Door

Check mark

Align new door with the bottom hinge and re-screw the top (3) 3/8” hex bolts to secure the door.

Check mark

Place the stainless steel top back onto the unit and secure with the 1/4” hex bolts.

Check mark

Final Checks

Run this procedureArrow right

Shelving Adjustment

Check mark

Remove Shelving

Check mark

Locate the pilaster clip

Check mark

Apply pressure to the bottom of the clip and slide out to remove

Check mark

Align Clips

Check mark

Set desired height using the numbered slots on the pilaster strips

Check mark

Adjust all clips to the same number on the pilaster strips

Check mark

Insert Clips

Check mark

Insert the top part of the clip into the slot

Check mark

Apply pressure to the bottom half of the clip until the clip snaps into place

Run this procedureArrow right

60 Daily Condenser Cleaning

Check mark

Preparation

Check mark

Ensure the unit is turned off

Check mark

Remove the front grill

Check mark

Cleaning the Condenser

Check mark

Use mild detergent and warm water

Check mark

Avoid corrosive products

Check mark

Rinse and dry the condenser

Check mark

Cleaning the Cooler Interior and Doors

Check mark

Clean the interior and doors

Run this procedureArrow right

Door Handle Change

Check mark

Remove Existing Handle

Check mark

Remove the eight 32 x 1/2” Phillips head screws located on the top and bottom bracket of your existing door handle.

Check mark

Remove the handle and set the screws aside for reuse.

Check mark

Assemble New Handle

Check mark

Slide the handle rod into the bottom bracket and top bracket.

Check mark

Insert the lock at an angle into the slot on the backside of the top bracket.

Check mark

Is the lock positioned facing down?

Check mark

Install New Handle

Check mark

Align the top bracket with the holes on the top of the door and secure with existing screws.

Run this procedureArrow right

LED Light Change

Check mark

Power Down and Remove Existing Light

Check mark

Power down the unit

Check mark

Remove the 1/4” hex screws

Check mark

Remove and Prepare Wires

Check mark

Remove the existing light

Check mark

Cut off both wire caps

Check mark

Reconnect New Light

Check mark

Reconnect wires with wires from the new light

Check mark

Reattach the electrical connector to the new wires

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Krowne

Explore Other Assets