

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Krowne Pass Thru Back Bar Cooler KPT52L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Sliding Door Change
Preparation
Locate the spring on the top frame of your refrigeration unit
Door Installation
Insert the top half into the frame, ensuring the spring is pulled back with the door
Did you apply pressure and push the bottom half in until you heard it snap into place?
LED Light Change
Power Down and Remove Existing Light
Power down the unit
Remove the (4) 1/4” hex screws
Remove the existing light
Disconnect and Reconnect Wires
Remove light and cut off both wire caps
Reconnect wires with wires from the new light
Reattach the electrical connector to the new wires
Reassembly
Door Handle Change
Remove Existing Handle
Remove the eight 32 x 1/2” Phillips head screws from the top and bottom bracket of the existing door handle.
Remove the handle and set the screws aside for reuse.
Assemble New Handle
Slide the handle rod into the bottom bracket and top bracket.
Insert the lock at an angle into the slot on the backside of the top bracket.
Is the lock positioned facing down?
Install New Handle
Align the top bracket with the holes on the top of the door and secure with existing screws.
Shelving Adjustment
Remove Shelving
Locate the pilaster clip
Apply pressure to the bottom of the clip and slide out to remove
Align Clips
Align clips to desired height using the numbered slots on the pilaster strips
Adjust all clips to the same number on the pilaster strips
Insert Clips
Insert the top part of the clip into the slot
Apply pressure to the bottom half of the clip until the clip snaps into place
Stainless Steel Top Change
Front Hex Screws
Locate the 1/4” hex screws on the front of the unit.
Remove the 1/4” hex screws on the front of the unit above the doors and set them aside.
Back Hex Screws
Locate the 1/4” hex screws on the back of the unit.
Remove the 1/4” hex screws on the back of the unit and set them aside.
Top Replacement
Was the existing stainless steel top lifted off with 2 or more people?
Place the new stainless steel top on your unit.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













