MaintainX Asset Hub logo
EnterprisePricing
Krowne

Krowne Sliding Door Back Bar Cooler SD108

Need answers fast?
Explore the manual using AI.

Krowne Sliding Door Back Bar Cooler SD108
Krowne Sliding Door Back Bar Cooler SD108

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Krowne Sliding Door Back Bar Cooler SD108

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Krowne Sliding Door Back Bar Cooler SD108

Krowne Sliding Door Back Bar Cooler SD108

Create an account to install this asset package.

Maintenance Plans for Krowne Sliding Door Back Bar Cooler Model SD108

Integrate maintenance plans directly into your work orders in MaintainX.

Sliding Door Change

Check mark

Spring Location and Insertion

Check mark

Locate the spring on the top frame of the refrigeration unit

Check mark

Insert the top half into the frame ensuring the spring is pulled back with the door

Check mark

Door Installation

Check mark

Apply pressure and push the bottom half in until it snaps into place

Run this procedureArrow right

Door Handle Change

Check mark

Remove Existing Handle

Check mark

Remove the eight 32 x 1/2” Phillips head screws from the top and bottom bracket of the existing door handle.

Check mark

Remove the handle and set the screws aside for reuse.

Check mark

Assemble New Handle

Check mark

Slide the handle rod into the bottom bracket and top bracket.

Check mark

Insert the lock at an angle into the slot on the backside of the top bracket.

Check mark

Is the lock positioned facing down?

Check mark

Install New Handle

Check mark

Align the top bracket with the holes on the top of the door and secure with existing screws.

Run this procedureArrow right

60 Daily Condenser Cleaning

Check mark

Preparation

Check mark

Ensure the unit is turned off using the shut off switch next to the digital thermostat.

Check mark

Remove the front grill to access the condenser.

Check mark

Cleaning the Condenser

Check mark

Clean the condenser with a mild detergent, warm water, and a soft cloth.

Check mark

Ensure all cleaning materials are washed away.

Check mark

Dry the condenser completely.

Check mark

Cleaning the Cooler Interior and Doors

Check mark

Clean the interior and doors with a mild detergent, warm water, and a soft cloth.

Run this procedureArrow right

Stainless Steel Top Change

Check mark

Front Hex Screws

Check mark

Locate the 1/4” hex screws on the front of the unit.

Check mark

Remove the 1/4” hex screws on the front of the unit above the doors and set them aside.

Check mark

Back Hex Screws

Check mark

Locate the 1/4” hex screws on the back of the unit.

Check mark

Remove the 1/4” hex screws on the back of the unit and set them aside.

Check mark

Top Replacement

Check mark

Was the existing stainless steel top lifted off with 2 or more people?

Check mark

Place the new stainless steel top on the unit.

Run this procedureArrow right

LED Light Change

Check mark

Preparation

Check mark

Power down the unit

Check mark

Light Removal

Check mark

Remove the (4) 1/4” hex screws to remove the existing light

Check mark

Remove the existing light

Check mark

Cut off both wire caps

Check mark

Light Installation

Check mark

Reconnect wires with wires from the new light

Check mark

Reattach the electrical connector to the new wires

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Krowne

Explore Other Assets