

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM220L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 3 Hours Blower Check
Performing checks after commissioning — After the first 3 operating hours
Re-tighten screws if necessary after the machine has cooled down
Check intake pressure valve for correct operation
Check oil level and correct if necessary
Check and align the sheaves, correct if necessary
Check condition of the belts, change if necessary, establish cause
Check control system, fault transmitter, pressure and temperature sensors for correct operation
Ensure motor overload protection is connected and active
Check for accumulation of preservative oil and remove if necessary
Initial 25 Hours Blower Check
Performing checks after commissioning — After the first 25 operating hours
Check the oil level
Correct the oil level if necessary
Check the alignment of the sheaves
Correct the alignment of the sheaves if necessary
4000 Hourly / 6 Monthly Intake Pressure Valve Check
Movement check for Variation a
Loosen the tensioning seals or the tensioning screws, depending on the silencer design
Remove the silencer cover
Check for correct operation, correct movability and exact alignment of the valve
Can the valve be moved and does it close correctly?
Attach the silencer cover and close it after the test
Movement test for Variation b
Remove the side-mounted sealing screws
Guide screwdrivers through the holes
Initial 500 Hours Lube Oil Change
Draining - Version with Oil System
Allow the lube oil to cool down to ambient temperature to avoid scalding and material damage.
Prepare for oil draining
Open the oil opening on the oil filling container.
Feed the drain hose into the receptacle.
Remove the sealing cap from the drain valve and twist the drain hose onto the drain valve.
Guide all emerging lube oil into the receptacle to avoid slipping.
Remove the drain hose; The drain valve closes automatically.
Screw the sealing cap onto the drain valve.
20000 Hourly / 3 Yearly Blower Overhaul
8.2.1 Maintenance schedule for normal operation
Check that all the parts are in place
Inspect the entire machine for any visible damage or wear
Have all necessary replacement and expendable parts been changed?
Describe any issues found during inspection
Technician's signature to confirm completion of maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













