Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-3465-G
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Switch Maintenance
Pre-maintenance Shutdown
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Confirm system pressure is eliminated and the unit's pressure gauges read '0' pressure
Pressure Switch Removal
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Sensor Probe Maintenance
Reconnection Procedure
Unplug the sensor probe connection and shake out water
Did the error display change to Solid Red?
Press the Start push button to clear the error display
Replacement Procedure
Cease process operations as outlined in section 3.4 of the manual
Ensure all process pressure is relieved and pressure gauges read '0' pressure
Drain the unit by removing the pump casing drain plug
Disconnect the sensor probe service plug
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify that the unit's pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Removal
Voltage Change
Pre-Conversion Consultation
Consult with the Advantage Service Department to determine if your unit can be converted. Have your Serial Number ready and call 317-887-0729.
Typical Conversions
Select the conversion type
Items Requiring Replacement or Rewiring
Identify items for replacement or rewiring
Field Voltage Changeover Procedure
Disengage operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Electronic Instrument Maintenance
In Warranty Service Incident
Call the factory for diagnostic assistance
Was a control instrument determined to be at fault?
Send a new or reconditioned instrument as a replacement
Return the defective instrument freight pre-paid for full credit
Was the defective instrument returned?
Pay for the instrument if not returned
Out of Warranty Service Incident
Call the factory for diagnostic assistance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX