MaintainX Asset Hub logo
EnterprisePricing
Gusher Pumps

Gusher Pumps Pump 2.5×3

Need answers fast?
Explore the manual using AI.

Gusher Pumps Pump 2.5×3
Gusher Pumps Pump 2.5×3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gusher Pumps Pump 2.5×3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gusher Pumps Pump 2.5×3

Gusher Pumps Pump 2.5×3

Create an account to install this asset package.

Maintenance Plans for Gusher Pumps Pump Model 2.5×3

Integrate maintenance plans directly into your work orders in MaintainX.

Ball Bearing Temperature Inspection

Check mark

MAINTENANCE — Lubrication / START UP

Check mark

Check ball bearing temperature using a pyrometer

Check mark

Is the ball bearing temperature below 225°F?

Check mark

Note if bearings seem to run tight and hot upon initial startup

Check mark

Confirm if the pump operates normally after approximately 150 hours of service

Run this procedureArrow right

Impeller Adjustment

Check mark

Preparation

Check mark

Disconnect coupling (#32) and remove sleeve (#32a)

Check mark

Loosen three locking screws (#57)

Check mark

Loosen three adjusting screws (#55)

Check mark

Adjustment

Check mark

Lightly tap shaft (#1) until impeller bottoms on the intake flange

Check mark

Tighten three adjusting screws by hand until they touch ball bearing housing

Check mark

Tighten three adjusting screws just up to the point where the shaft turns freely; then tighten each screw an additional ¼ turn

Check mark

Tighten locking screws (#57) and jamb nuts (#56)

Run this procedureArrow right

Pump Startup Check

Check mark

START UP — After Start Up

Check mark

Measure and record the discharge pressure

Check mark

Measure and record the flow rate

Check mark

Measure and record the motor amp draw

Check mark

Describe the location of the pressure gauge in relation to the liquid level

Check mark

START UP — Final Checks

Check mark

Verify if the mounting plate height is at least 1" above the highest possible liquid level

Check mark

Check if the liquid level is at least 2" above the point at which the shaft exits the top of the pump end

Check mark

Test shaft rotation for clockwise direction

Run this procedureArrow right

Pump Maintenance

Check mark

Disassembly

Check mark

Disconnect electrical leads

Check mark

Remove coupling guard

Check mark

Disconnect coupling

Check mark

Remove four motor retaining bolts

Check mark

Break welds loose that hold discharge pipe cover plate to mounting plate

Check mark

Remove bolts & nuts that hold discharge pipe to impeller housing

Check mark

Remove discharge pipe

Check mark

Chair and Drive Motor: 52VHD Power Frame

Run this procedureArrow right

1200 Hourly Ball Bearing Lubrication

Check mark

Maintenance — Lubrication

Check mark

Ensure pump is shut down before lubrication

Check mark

Verify no mixing of grease types

Check mark

Use appropriate grease

Check mark

Ensure initial fill grease is purged if using alternative grease

Check mark

Avoid over-greasing to prevent overheating

Check mark

Ensure bearings do not exceed 225°F

Check mark

Shut down pump

Check mark

Remove relief from back of ball bearing housing

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gusher Pumps

Explore Other Assets