Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gusher Pumps Pump 2.5×3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Ball Bearing Temperature Inspection
MAINTENANCE — Lubrication / START UP
Check ball bearing temperature using a pyrometer
Is the ball bearing temperature below 225°F?
Note if bearings seem to run tight and hot upon initial startup
Confirm if the pump operates normally after approximately 150 hours of service
Impeller Adjustment
Preparation
Disconnect coupling (#32) and remove sleeve (#32a)
Loosen three locking screws (#57)
Loosen three adjusting screws (#55)
Adjustment
Lightly tap shaft (#1) until impeller bottoms on the intake flange
Tighten three adjusting screws by hand until they touch ball bearing housing
Tighten three adjusting screws just up to the point where the shaft turns freely; then tighten each screw an additional ¼ turn
Tighten locking screws (#57) and jamb nuts (#56)
Pump Startup Check
START UP — After Start Up
Measure and record the discharge pressure
Measure and record the flow rate
Measure and record the motor amp draw
Describe the location of the pressure gauge in relation to the liquid level
START UP — Final Checks
Verify if the mounting plate height is at least 1" above the highest possible liquid level
Check if the liquid level is at least 2" above the point at which the shaft exits the top of the pump end
Test shaft rotation for clockwise direction
Pump Maintenance
Disassembly
Disconnect electrical leads
Remove coupling guard
Disconnect coupling
Remove four motor retaining bolts
Break welds loose that hold discharge pipe cover plate to mounting plate
Remove bolts & nuts that hold discharge pipe to impeller housing
Remove discharge pipe
Chair and Drive Motor: 52VHD Power Frame
1200 Hourly Ball Bearing Lubrication
Maintenance — Lubrication
Ensure pump is shut down before lubrication
Verify no mixing of grease types
Use appropriate grease
Ensure initial fill grease is purged if using alternative grease
Avoid over-greasing to prevent overheating
Ensure bearings do not exceed 225°F
Shut down pump
Remove relief from back of ball bearing housing
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.