MaintainX Asset Hub logo
EnterprisePricing
Gusher Pumps

Gusher Pumps Pump CL6×8

Need answers fast?
Explore the manual using AI.

Gusher Pumps Pump CL6×8
Gusher Pumps Pump CL6×8

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gusher Pumps Pump CL6×8

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gusher Pumps Pump CL6×8

Gusher Pumps Pump CL6×8

Create an account to install this asset package.

Maintenance Plans for Gusher Pumps Pump Model CL6×8

Integrate maintenance plans directly into your work orders in MaintainX.

600 Hourly Ball Bearing Lubrication

Check mark

Maintenance — Lubrication

Check mark

Ensure pump is shut down before lubrication

Check mark

Verify grease type

Check mark

Is the pump running at 3450 rpm?

Check mark

Remove relief from back of ball bearing housing

Check mark

Fill with grease until fresh grease flows from opening

Check mark

Is an automatic lubrication system being used?

Check mark

Place reliefs in the tapped hole (1/8" N.P.T.) if automatic lubrication system is used

Check mark

Ensure bearings do not run over 225°F

Run this procedureArrow right

1200 Hourly Coupling Alignment Check

Check mark

MAINTENANCE — Coupling Alignment

Check mark

Check coupling alignment at specified intervals

Check mark

Check Parallel Alignment

Check mark

Check Angular Alignment

Check mark

Ensure motor screws are snug to allow slight force for movement during alignment.

Check mark

Recheck both parallel and angular alignment after any adjustment.

Check mark

Adjustment Procedures

Check mark

Adjust Lateral Parallel Misalignment

Check mark

Adjust Horizontal Parallel Misalignment

Run this procedureArrow right

1200 Hourly Ball Bearing Lubrication

Check mark

Maintenance — Lubrication

Check mark

Ensure pump is shut down before lubrication

Check mark

Verify that grease types are not mixed

Check mark

Use appropriate grease

Check mark

Was the initial fill grease purged if using a different grease?

Check mark

Ensure not to over grease

Check mark

Ensure bearings do not exceed 225°F

Check mark

Shut down pump

Check mark

Remove relief from back of ball bearing housing

Run this procedureArrow right

Ball Bearing Temperature Inspection

Check mark

MAINTENANCE — Lubrication / START UP

Check mark

Check ball bearing temperature using a pyrometer

Check mark

Is the ball bearing temperature below 225°F?

Check mark

Note if bearings seem to run tight and hot upon initial startup

Check mark

Confirm if the pump operates normally after approximately 150 hours of service

Run this procedureArrow right

Pump Startup Check

Check mark

START UP — After Start Up

Check mark

Measure the discharge pressure

Check mark

Measure the flow rate

Check mark

Measure the motor amp draw

Check mark

Note the location of the pressure gauge in relation to the liquid level

Check mark

START UP — Final Checks

Check mark

Verify if the mounting plate height is at least 1" above the highest possible liquid level

Check mark

Check if the liquid level is at least 2" above the point at which the shaft exits the top of the pump end

Check mark

Test shaft rotation for clockwise direction

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gusher Pumps

Explore Other Assets