MaintainX Asset Hub logo
EnterprisePricing
Gusher Pumps

Gusher Pumps Pump 2×2.5

Need answers fast?
Explore the manual using AI.

Gusher Pumps Pump 2×2.5
Gusher Pumps Pump 2×2.5

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gusher Pumps Pump 2×2.5

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gusher Pumps Pump 2×2.5

Gusher Pumps Pump 2×2.5

Create an account to install this asset package.

Maintenance Plans for Gusher Pumps Pump Model 2×2.5

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Startup Check

Check mark

START UP — After Start Up

Check mark

Measure the discharge pressure

Check mark

Measure the flow rate

Check mark

Measure the motor amp draw

Check mark

Record the location of the pressure gauge in relation to the liquid level

Check mark

START UP — Final Checks

Check mark

Verify if the mounting plate height is at least 1" above the highest possible liquid level

Check mark

Check if the liquid level is at least 2" above the point at which the shaft exits the top of the pump end

Check mark

Test shaft rotation for clockwise direction

Run this procedureArrow right

Initial 300 Hours Coupling Alignment Check

Check mark

INSTALLATION — Coupling Alignment (Chair Mounted Model ONLY)

Check mark

Check Parallel Alignment

Check mark

Check Angular Alignment

Check mark

Adjust Coupling Alignment if Necessary

Check mark

Adjust Lateral Parallel Misalignment

Check mark

Adjust Horizontal Parallel Misalignment

Check mark

Adjust Lateral Angular Misalignment

Check mark

Adjust Horizontal Angular Misalignment

Check mark

Final Adjustment if Alignment Cannot be Achieved

Run this procedureArrow right

Bearing Maintenance

Check mark

Bearing Installation

Check mark

Clean the work area thoroughly

Check mark

Apply mounting force against the ring being press-fitted

Check mark

Ensure no pressure or hammer blows are applied to the other ring

Check mark

Use an arbor press with a face block contacting only the bearing inner ring

Check mark

Press the shaft through the bearing until seated firmly against the shaft shoulder

Check mark

Ensure the tubing is clean and slightly greater in diameter than the bearing journal

Check mark

Ensure the tubing end is square and contacts only the bearing inner ring

Check mark

Align the shaft with the ram of the arbor press to avoid cocking

Run this procedureArrow right

Ball Bearing Temperature Inspection

Check mark

MAINTENANCE — Lubrication / START UP

Check mark

Measure the temperature of the ball bearings using a pyrometer

Check mark

Is the temperature of the ball bearings below 225°F?

Check mark

Record observations about the bearing temperature and any unusual conditions during startup

Check mark

Confirm that the pump operates normally after approximately 150 hours of service

Run this procedureArrow right

600 Hourly Ball Bearing Lubrication

Check mark

MAINTENANCE — Lubrication

Check mark

Shut down pump

Check mark

Remove relief from back of ball bearing housing

Check mark

Fill with grease until fresh grease flows from opening

Check mark

If automatic lubrication system is being used, place reliefs in the tapped hole (1/8" N.P.T.)

Check mark

Check that all safety precautions are followed

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gusher Pumps

Explore Other Assets