

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-690-LEP
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Instrument Controller Maintenance
Preparation
Disengage process operations according to section 3.4
Verify all system pressure is relieved and pressure gauges read '0'
Disengage main power supply and verify the Power light is 'off'
Panel and Instrument Removal
Remove the thermoformed front panel by unscrewing 4 small screws
Open the hinged electrical cabinet panel cover by removing four small screws
Remove the large molex connector
Remove the ground terminals
Heating Cylinder Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Ensure the unit's pressure gauges read "0"
Disengage main power supply
Verify the Power light on the display is "off"
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Removal
Flow Meter Maintenance
Preparation
Reduce process water temperature to below 85 degrees F.
Disengage process operations and verify all system pressure is relieved and the pressure gauges read "0".
Disengage main power supply and verify the Power light on the display is "off".
Access Cooling Cylinder
Remove the lift-off access panel to access the cooling cylinder.
Disconnect the AVT valve cable, the hall effect sensor cable, the pressure gauge and pressure switch lines.
Remove Cooling Cylinder
Remove the 4 mounting bolts that hold the cooling cylinder to the pump volute.
Volatge Change
Pre-Conversion Consultation
Consult with the Advantage Service Department to determine if your unit can be converted. Have your Serial Number ready and call 317-887-0729.
Typical Conversions
Select the conversion type
Consult factory for other power conversions
Items Requiring Replacement or Rewiring
Check items for replacement or rewiring
Field Voltage Changeover Procedure
Disengage operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure
Disengage main power supply and verify the Power light on the display is 'off'
Access Panel Removal
Remove the lift-off access panel and set aside
Remove the thermoformed panel attached by 4 small screws
Drain and Disconnect
Drain machine by removing the pump casing drain plug
Remove the three motor wire leads from the motor wiring terminals and map the wire terminal locations
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













