Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-1075-LEP
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in this manual.
Ensure proper lock-out procedures are followed.
Ensure system pressure is eliminated and the unit's pressure gauges read '0' pressure.
Pressure Switch Removal
Drain unit by removing the pump casing drain plug.
Remove the capillary connection from the cooling cylinder to the pressure switch.
Remove the brass elbow mounted on the pressure switch.
Remove the electrical connections to the pressure switch.
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure
Disengage main power supply and verify the Power light on the display is 'off'
Access Panel Removal
Remove the lift-off access panel and set aside
Remove the thermoformed panel attached to the stainless steel cabinet by 4 small screws
Drain and Disconnect
Drain machine by removing the pump casing drain plug
Remove the three motor wire leads from the motor wiring terminals and map the wire terminal locations
Sensor Probe Maintenance
Reconnection
Unplug the sensor probe connection
Shake out water from the service connection
Replug the sensor probe connection
Did the error display change to Solid Red?
Press the Start push button to clear the error display
Replacement
Cease process operations as outlined in section 3.4 of the manual
Is all process pressure relieved and do the unit's pressure gauges read '0' pressure?
Heating Cylinder Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify that the unit's pressure gauges read "0"
Disengage main power supply
Verify the Power light on the display is "off"
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Removal
Flow Meter Maintenance
Preparation
Reduce process water temperature to below 85 degrees F.
Disengage process operations and verify all system pressure is relieved and the pressure gauges read "0".
Disengage main power supply and verify the Power light on the display is "off".
Access Cooling Cylinder
Remove the lift-off access panel to access the cooling cylinder.
Disconnect the following components
Remove Cooling Cylinder
Remove the 4 mounting bolts that hold the cooling cylinder to the pump volute.
Access the parts list for your equipment in MaintainX.
Motor/Pump Assembly AS5 2HP 2/4/3/60
6207030
Adapter - Iron C2-4551 AS5
414
Pump Case - Iron D2-1839 AS5
771599
Tank Gasket 2-3/8" A-9159 AS5
3444400
Tank Gasket 4-1/2" A2-8748 AS5
3444401
Motor/Pump Assembly AS5 2HP 2/4/3/60
6207030
Adapter - Iron C2-4551 AS5
414
Pump Case - Iron D2-1839 AS5
771599
Tank Gasket 2-3/8" A-9159 AS5
3444400
Tank Gasket 4-1/2" A2-8748 AS5
3444401
Motor/Pump Assembly AS5 2HP 2/4/3/60
6207030
Adapter - Iron C2-4551 AS5
414
Pump Case - Iron D2-1839 AS5
771599
Tank Gasket 2-3/8" A-9159 AS5
3444400
Tank Gasket 4-1/2" A2-8748 AS5
3444401
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX